Laserfiche WebLink
I~~ I~II~II~IIIII1~~ <br />The Pittsburg & Midway Coal Mining Co. <br />A Chevron Company <br />Edna Mine <br />P.O. Box 176, Oak Creek, CO 80467 <br />Ms. Susan Morrison <br />CDMG <br />1313 Sherman St. <br />Room 215 <br />Denver, CO 80203-2273 <br />Dear Ms. Morrison, <br /> <br />VIAY ~ 9 i93~ <br />Diws;or, ui huae~a~~ a:.itoicy; <br />May 13, 1993 <br />With this letter we are informing the CDMG of progress made, to <br />date, on abatement steps for the 5 Notices of Violation (C-93-023 <br />through C-93-027) issued to the Edna Mine as part of the joint CDMG <br />and OSM oversight inspection held 3/29/93 through 4/2/93. <br />The date of service for the Notices was 4/5/93 (NOV ;C-93-025 is <br />not dated) and the Notices were signed for delivery on 4/8/93 in <br />the afternoon. 4/9/93 was a scheduled holiday at the mine and thus <br />staff responsible in these matters did not see the material until <br />4/12/93. A meeting was held on 4/14/93 with yourself and Larry <br />Routen to discuss content and requirements of the N.O.V.s. At this <br />meeting extensions were requested and granted for components of the <br />abatement processes. Following is a list of the abatement steps <br />completed, by violation, and the dates on which those steps were <br />completed. <br />NOV C-93-023: Abatement step 1 involved submitting a Technical <br />Revision to provide designs for alternate sediment <br />control from the area. T.R. 22 was submitted to <br />your office on 4/20/93 satisfying this requirement. <br />Abatement step 2, which is implementation of these <br />alternate control measures, cannot be completed <br />until the Technical Revision has been approved. <br />NOV C-93-024: Abatement step 1, due 5/20/93, is to submit a <br />Technical Revision detailing a plan to control <br />erosion from surface water runoff on the Goat <br />Trail. We believe that such a plan exists in prior <br />correspondence between the then CMLRD and P&M. A <br />Technical Revision is being prepared to incorporate <br />the terms of this agreement into the pernit <br />document. This step has not yet been completed. <br />Abatement step 2 is to implement the plan submitted <br />in the Technical Revision. Since the structures <br />for the plan, noted in the previous paragraph, are <br />