Laserfiche WebLink
J <br />• <br />• <br />IV. Problems, Recommendations and Compliance Dates <br />The operator is advised that the following problems have been identified <br />during inspections and that failure to correct the problems may result in the <br />Division taking an ENFORCEMENT ACTION pursuant to CRS 1973, as amended, <br />34-33-123. (Recommendations and compliance dates are to be clearly noted. <br />Dates are to be specific, e.g., January 31, 1983 and underlined.) <br />Abatements <br />CO C-85-043 <br />Immediately cease further storage or other disturbance adjacent to the Middle <br />Creek office/shop facility. <br />Steps to abate: <br />1. Remove all petroleum products to approved containment area by June 1, 1985. <br />2. Removal all equipment, supplies and machinery and place in approved <br />storage area by June 20, 1985. <br />3. Grade disturbed area and stabilize soil by June 25, 1985. <br />NOV C-85-044 <br />Abatement had been completed upon reinspection of May 24, 1985. NOV C-85-044 <br />has been terminated. <br />NOV C-85-045 <br />Construct Ditch P-1 and dewater Middle Creek detention basin to provide for <br />design storage by June 20, 1985. <br />NOV C-85-046 <br />1. Divert spring flow in a manner which will not result in additional erosion <br />by July 1, 1985. <br />NOV C-85-047 <br />Clean out ditch and clean out and repair gravel filter sediment trap by <br />June 1, 1985. <br />