• I R L E S Lost Estimating Sof tuare • sheet 1 of 2 <br />EARTHWORK FORM - WHEEL LOADER YORK <br />____________________________________ <br />____________________________________ <br />Agency or organization name DMG <br />Task # 04a State Colorado Permit # M-91-146 <br />Date 08/02/99 Lounty Ouray Abbr. none <br />User SSS Site Zmk Gravel Pit Filename M146-04a <br />Permit/job action Technical Revision No. 3 <br />Task description Fill nest bank 'access road berm breaches <br />HOURLY EQUIPMENT COST <br />_____________________ Basic machine :CAT 926E (94)HOrsepower 110 <br />Attachment #1 :ROPS Cab Shift basis: 1/day <br />(CRG) <br />i Cost Breakdown Ownership E/hour E9.68 <br />-------------- Operating E/hour E11.74 85 Y utiLixation <br />Operator E/hour E23.12 <br />Total unit E/hour: E44.54 Total fleet cost/hr E44.84 <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume 100 LCY factor NA volume 100 LCY <br />Quantity source/reference TR-001 - 50 c.y. each access <br />X Swell source/reference NA <br />HOURLY PRODUCTION <br />_________________ <br />_________________ <br />Loader Cycle Time <br />Unadjusted basic cycle time (load, dump 8 maneuver) 0.470 min. <br /> (LAT HB) <br />Cycle Time Factors Factor (min.) <br />Type of material Bank or broken material 0.040 (CAT HB) <br />Type of stockpile Dumped by truck 0.020 (CAT HB) <br />Truck ownership No adjustment - factor not applicable 0.000 (LAT HB) <br />Type of operation lnconsi stent operation 0.040 (CAT HB) <br />Type of dump target: Small target 0.040 (CAT HB) <br /> Net cycle time adjustment 0.140 min. <br /> Adjusted has is cycle time 0.670 min. <br />