Laserfiche WebLink
• C I R C E S Cost Estimating Software • <br />EART NwORK FORM - BULLDOZER WORK <br />Agency or organization name DMG <br />Task # 02a State Colorado Permit # :M-91.146 <br />Date 08/02/99 County Ouray Abbr. : none <br />User SSS Site Zmk Grave l Pit Filename M146-02a <br />Permit/job action Technical Revision No. 3 <br />Task description Establish berm breach 8 replace after recharge <br />HOURLY EQUIPMENT COST Basic machine Cat D7H 5.2 (1996) Horsepower 215 <br />_____________________ Blade type Semi-Universal ---------- <br />' Attachment #1 ROPS Cab Shift basis: 1/day <br /> Attachment #2 NA ---------~ <br /> Utilization L (CRG7 <br />Cost Breakdown Ownership E/hour 831.30 NA <br />-------------- Operating S/hour 541.23 100 <br /> Ripper ap.S/hour E0.00 NA <br /> Operator S/hour 823.12 NA <br /> Total unit 5/hour: E95.65 Total f leet 5/hour 595.65 <br />MATERIAL QUANTITIES <br />_____________________ <br />_____________________ <br />Initial <br />Swell <br />Loose <br />volume 142 LCY factor NA volume 142 <br />_-__ <br />______- LCY <br />_____________ <br />Source of quantity take-off 20~W cut _________- <br />th ru trapezoid berm -_ <br />20' base x 8'H <br />Source of est. swell factor NA <br />HOURLY PRODUCTION <br />____ ____________ Job Condition Correction Factors <br />Avg. push distance 125 ft. ------------------- -------------- <br /> --------- Operator.......... 0.75 (avg.) <br />Unadjusted hourly Mat. consistency.. 1.20 (CAT HB) <br />dozer production 488 LCY/hr Dozing method..... 1.00 (gen.) <br />' --------- Visibility........ 1.00 (avg.) <br />Material consistency description Job efficiency.... 0.83 (tsh/day) <br />Loose stockpile Spoil pile factor. 0.80 (fnd-rf) <br />-------------------- ------------------ -Push gradient..... 1.00 (CAT HB) <br />Avg. push gradient 0.00 X (pos) Altitude deration. 1.00 (CAT HB) <br /> --------- Material weight... 0.71 (CAT HB) <br />Avg. site altitude : 7,780 ft. Blade type........ 1.00 (S or U) <br />Material weight 3,250 lb/LCY Net job correction 0.42 <br />Mat. description --------- ------------ - <br />Gravel - Pitrun Adjusted unit prod. : 206.42 LCY/hr <br /> Adjust ed fleet production 206.42 LCY/hr <br />JOB COST ------------ - <br />Fleet size 1 Dozers ) To[al jab time 0.69 Hours <br />Unit cost 50.463 /LCY Total job cost - 865.80 <br />