Laserfiche WebLink
~1 of4 <br />C~rado Division of Minerals and Geology <br />_________________________________________ <br />RECLAMRT ION COST SUMMARY fORM <br />_____________________________ <br />_____________________________ <br />PERMIT NUMBER M-91-146 PREP. BY: SSS FILENAME: M146-0 <br />DATE 02-Aug-99 OPERATION: Zmk Gravel Pit <br />_________ ________________________________ <br />PERMIT ACTION Technical Revision No. 3 <br />____________________________________________________ <br />GRAND TOTAL BOND AMOUNT 53,750 <br />I. DIRECT COSTS =___________ <br />________________________________________________________________________ <br />________________________________________________________________________ <br />A. EARTHWORK - RACKET CLING 8 ROUGH GRADING <br />Task No.l Task Description ~ Lost (S) <br />________I__________________________________________________I____________ <br />1a I Regrade portions of slopes of Phase I Area, ~ 8262 <br />Assume 800' by 20' banks graded at 2 ac.ft/ac. <br />2a ~ Establish berm breach 20' wide, to recharge Phase 5209 <br />I area. Re-establish the berm when recharge is <br />complete. Assume berm dimensions at 20'W base, <br />8'H, with 1:1 slopes and 4" top. Trapezoidal. <br />71 c.y. removed and 71 c.y. replaced. <br />3a ~ Task deleted, <br />Subtotal (A ): 5470 <br />B. EARTHWORK - HI GHWALL REDUCTION <br />Task No.~ Task Description ~ Cost (5) <br />Subtotal (B ): <br />C. EARTHWORK - WASTE PILE COVER PLACEMENT <br />Task No.~ Task Description ~ Cost (5) <br />________I______________~__________________________________I____________ <br />Subtotal (C): <br />