My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE20085
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE20085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:24:22 PM
Creation date
11/21/2007 9:43:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Enforcement
Doc Date
11/19/2000
Doc Name
ANSWER TO APPLEANTsS NOTICE OF APPEAL AND STATEMENT OF REASONS
Violation No.
TD1993020370005TV3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />17. On May 19, 1995, another inspection of <br />was conducted. Present for this inspection were <br />DMG, Mike Rosenthal of OSM, and Dr. Jesse Craft, <br />expert from OSM's Eastern Support Center. Also <br />Ralph Lopez and Larry Bennett of Basin Resources <br />Gerity, an engineer hired by the Tatums. See AR <br />the Tabun house <br />Jim Pendleton of <br />a subsidence <br />present were <br />as well as Carl <br />II-13. <br />18. In a memorandum dated May 24, 1995, DMG employ=_e Jim <br />Pendleton provided his comments and observations concerning the <br />May 19, 1995, inspection of the Tatum property. On page two of <br />his memorandum, Mr. Pendleton discusses old photographs of the <br />Tatum house that indicate, in Mr. Pendleton's opinion, that the <br />rain water drainage system of the house was improperly designed <br />and did not work correctly. Mr. Pendleton also asserts, on page <br />three of his memorandum, that Dr. Jesse Craft concluded, after <br />the inspection, that subsidence was not the cause of the damage <br />to the Tatum house. See AR II-13. <br />19. In a memorandum dated June 2, 1945, DMG emplo}'ee Jim <br />Pendleton provided his comments on a report on the Tatum property <br />written by John D, Reins on May 23, 1995. Mr. Reins was an <br />expert hired by the Tatums. For a copy of the Reins report, see <br />AR II-15. <br />In his memorandum, on page 2, Mr. Pendleton commented on the <br />concrete stucco finish of the Tatum house, asserting th,st his <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.