• Exhibit L • <br />STAGE 3 Maximum DisUrbance (total veers 34.421 Acres ACTIVITY Un6 Coat rfl Coat Mark-ug Tohl <br />Road and offiw (near) 0.46 Swdfiw8on and final mntoudnp f 250 f 120 15% f 136 <br />(reduced by north mlpration) 0.46 Revegetation S 600 f 266 15% f 331 <br />Plant Area P3 3.25 Saririwtion and (nal mrdoudng f 250 f 613 15% f 934 <br /> 3.25 Revegetation f 600 f 1,950 15% f 2,243 <br />Plant Area P2 3.67 Bacld-illing f 1,200 f 4,844 15% f 5,341 <br />(Now beirq mined) 7.67 Grading and mrrtoudn9 f 300 f 1,161 15% f 7,335 <br /> 3.67 Revegetation f fi00 f 2,322 15% f 2,870 <br />Valley Flmr f3 4.21 eac~llinp f 1,200 f 5,052 15% f 5,610 <br /> 4.21 Grading arM mrNrurinp S 300 f 1,263 15%f 1,452 <br /> 4.21 Revegetation f 600 f 2,526 15% f 2.905 <br />Bench Area 63 6.56 Grading and mMOUrinp f 300 f 1,966 15% f 2,283 <br /> 6.56 Revapeta8on f 600 f 3,936 15% f 4,526 <br />TOTAL f 26,043 f 29,949 <br />STAGE 4 Muimum Disturbance lOOhl vnrs 4231 Acres ACTIVITY Unit Caro Ifl Cost Mark-uo Todl <br />Road and offiw (new) 0.26 Swrdwtion and final mntoudnp f 250 f 70 15% f 61 <br />(reduced by noM migration) 0.26 Revepeh8on f 600 f 166 15% f 193 <br />Plant Area P3 3.25 Backfilling f 1,200 f 3,900 15% f 4,465 <br />(Now being mined) 3.25 Grading and mrrtouring S 300 f 975 15% f 1,121 <br /> 3.25 Revegehtion f 600 f 1,950 15% f 2,243 <br />TOTAL f 7,063 f 6.722 <br />These figures represent present (1999) costs using contracted equipment and <br />personnel. <br />NOTES: <br />1. The portion of the backfilling associated with stripping has not been included, as the <br />cost would not be incurred if the stripping was not done. <br />2. Revegetation is based on using existing soil types for the entire site and vegetating <br />appropriately. Revegetation includes costs of soil amendment and fertilization (if <br />used). <br />3. It is assumed that stockpile and plant areas will require no backfilling for the stage <br />in which the area is in use, since the area will not be mined until the next stage. <br />4. Backfilling of bench areas is not included since such backfilling is done as part of <br />stripping for the other bench areas. <br />5. Backfilling of valley floor areas for reclamation bond estimate purposes is based on <br />having to either use backfill material stockpiled in the plant and bench areas, or <br />actually extract additional material from the bench to backfill to the desired elevation <br />in the valley floor. <br />6. Grading and contouring of initial valley floor area includes work to daylight swale to <br />allow surface water flow from new valley floor. <br />All acreages are estimates. <br />Trans-Colorado Concrete October 99 <br />Application for Permit: Spotted Burro Pit Page 33 <br />