Laserfiche WebLink
• Exhibit L <br />EXHIBIT L -RECLAMATION COSTS <br />i The preliminary estimated reclamation costs for this plan total $17,024 (not including <br />DMG add-on costs) for the initial development, and $75,211 for the entire project. With <br />a total of 15°/d added costs for DMG management and administration, the total project <br />cost is $86,492.65. <br />UNIT COSTS ACTIVITY <br />Bac~lling <br />Grading and wMOUring <br />Scar~mtlan and final contoudng <br />Revegeta5en <br />PERIO LOCATION Acres ACTI ITY <br />CURRENT DISTURBANCE On bents 1.11 Bac~lling <br /> 1.11 Grading and coMOUring <br /> 1.11 Revegetafion <br />Rmd 1.34 None required: existing pre-mining <br />Offim area 0.5 None required: existing pre-mining <br /> <br />f/acre <br />f 1,200 assuming no upend mining done <br />f 300 <br />f 250 <br />f 600 including 50%rcaeeding <br />Unit Cos<(fl Coat Mark-uo Tahlf <br />f 1,200 f 1,332 15% f 1,532 <br />f 300 f 333 15% f 363 <br />f 600 S 666 15% f 766 <br />f 2,331 S 2,Fa1 <br />STAGE 1 Maximum Diaturtanm fte71 veers 1-161 <br />Rmd and offim (nsw9 <br />Plant Area P7 <br />Valley Area F1 <br />Bench Ana B7 <br />TOTAL <br />Acres ACTT ITV <br />0.66 Smrdmaon and final contoudng <br />O.aa Revegetaeon <br />3.63 Smri0m0on and final wMOUdrrg <br />3.63 Revepslation <br />Unit CoC ff1 Cast Markup Taral <br />f 250 f 220 15% f 253 <br />f 600 f 526 15% f fi07 <br />f 250 f 996 15% f 1,101 <br />f 600 f 2,296 15% f 2,643 <br />f 1,200 f 1,356 15% S 1,559 <br />f 300 f 339 15% f 390 <br />f 600 f 676 15% S 760 <br />f 300 f 2,772 15% f 3,166 <br />f 600 f 5,544 15% S 6,376 <br />1.13 Backfilling <br />1.13 Grading and mnburing <br />1.13 Revegehtion <br />9.24 Ceding and contouring <br />9.24 RevegelaEOn <br />STAGE 2 Maximum Dirsurbmm (total veers 17.331 Acres ACTIVITY <br />Rmd and oKm (nevi O.fi6 Smrdipaon and final mnlounng <br />(reduced by noM mipra0on) O.fi6 Revegehaon <br />Plant Area P2 3.67 SarBcation and final coMOUdng <br /> 3.67 Reveyetation <br />PIaM Area P7 3.63 Bacldlling <br />(New being mined) 3.a3 Grading and mnbudng <br /> 3.a3 RevegetaEOn <br />Valley Area FZ 2.71 Back6ning <br /> 2.71 Grading and conbunng <br /> 2.71 Revegetsean <br />Bench Area B2 a.31 Grading and coMOUring <br /> a31 Revegelatlon <br />TOTAL <br />f 14,693 S 16,a% <br />Unit Cast ff1 Coat Ma~-u Tabl <br />f 250 f 170 15% f 1% <br />f 600 f 406 15% f 469 <br />f 250 f 96a 15% f 1,113 <br />f fi0D f 2,322 15% f 2.670 <br />s 1.200 s 4,s% 1s% s s,2as <br />f 300 f 1,149 15% f 1,321 <br />f 600 f 2,2% 15% f 2,643 <br />S 1,200 f 3,252 15% f 3,740 <br />S 300 f 613 15% f 935 <br />f 600 f 1,628 15% f 1,670 <br />f 300 f 2,493 15% f 2,x67 <br />f G00 f 4.966 15% f 5,734 <br /> f 25,061 f 26,643 <br />Trans-Colorado Concrete <br />Application for Permit: Spotted Burro Pit <br />October 99 <br />Page 32 <br />