My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-01-10_REVISION - M1989084
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1989084
>
2005-01-10_REVISION - M1989084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:14:42 PM
Creation date
11/21/2007 9:43:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989084
IBM Index Class Name
Revision
Doc Date
1/10/2005
Doc Name
Reclamation Cost & Summary
From
DMG
To
File
Type & Sequence
SO1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimation Software <br />Task # : 001 <br />Date : 01/10/2005 <br />User: LDO <br />Agency or organization name :OMG <br />Permit or other job action :Succession of operator/bond calculation <br />Task description :Rip pit floor <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br /> _ Data source : (CRG} <br /> Utilization <br />Cost Breakdown : Ownership cosf/hour : $48.85 NA <br />Dozer operating cosUhour : $66.09 100 <br />Ripper operating wsUhour : $7.10 100 <br />Operator cosf/hour : $31.76 NA <br />Total unit cosUhour : $153.80 Total fleet cosUhour : $153.80 <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic : NA NA Load factor : NA <br />Area : 15.00 acres Rip depth (ft) : 1.00 <br />State :Colorado <br />County :Fremont <br />Site :Oak Creek Gravel Pit <br />Basic machine :Cat D8R Series 11 <br />Blade type :Universal <br />Attachment no. 1 : BOPS Cab <br />Attachment no. 2 :3-shank ripper <br />8U Horsepower : 310 <br />Selected estimating method : Area <br />PermiUjob # : M-1998-084 <br />Abbreviation :none <br />Filename : M084-001 <br />Bank volume : NA BCY <br />Volume : 24,200 BCY or CCY <br />Source of estimated quantity :reclamation plan <br />Source of estimated load factor : NA <br />: ,...:; <br />.::. <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity <br />Unadjusted production <br />NA feeUsecond <br />NA cu, yds./hour <br />Unadjusted production <br />per selected method : 1,326.18 cu. yds./hour <br />Area : Avg. ripping depth : 1.00 feeUpass Site altitude : 7,800 feet <br />Average ripping width : 7.08 feeUpass Altitude adjustment : 1.00 (Cat HB} <br />Average ripping length : 500.00 feeUpass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feeUminute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minuteslpass <br />Production per unit area : 0.822 acres/hour Adjusted unit production : 1,100.73 cu. yds./hour <br />Unadjusted production : 1,326.18 cu. yds./hour Adjusted fleet production : 1,100,73 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 1 dozers) Total job time : 21.99 hours <br />Unit cost : $0.140 per cu. yd. Total job cost : $3,381 <br />
The URL can be used to link to this page
Your browser does not support the video tag.