Laserfiche WebLink
CIRCES Cost Estimation Software <br />Task # : 001 <br />Date : 01/10/2005 <br />User: LDO <br />Agency or organization name :OMG <br />Permit or other job action :Succession of operator/bond calculation <br />Task description :Rip pit floor <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br /> _ Data source : (CRG} <br /> Utilization <br />Cost Breakdown : Ownership cosf/hour : $48.85 NA <br />Dozer operating cosUhour : $66.09 100 <br />Ripper operating wsUhour : $7.10 100 <br />Operator cosf/hour : $31.76 NA <br />Total unit cosUhour : $153.80 Total fleet cosUhour : $153.80 <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic : NA NA Load factor : NA <br />Area : 15.00 acres Rip depth (ft) : 1.00 <br />State :Colorado <br />County :Fremont <br />Site :Oak Creek Gravel Pit <br />Basic machine :Cat D8R Series 11 <br />Blade type :Universal <br />Attachment no. 1 : BOPS Cab <br />Attachment no. 2 :3-shank ripper <br />8U Horsepower : 310 <br />Selected estimating method : Area <br />PermiUjob # : M-1998-084 <br />Abbreviation :none <br />Filename : M084-001 <br />Bank volume : NA BCY <br />Volume : 24,200 BCY or CCY <br />Source of estimated quantity :reclamation plan <br />Source of estimated load factor : NA <br />: ,...:; <br />.::. <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity <br />Unadjusted production <br />NA feeUsecond <br />NA cu, yds./hour <br />Unadjusted production <br />per selected method : 1,326.18 cu. yds./hour <br />Area : Avg. ripping depth : 1.00 feeUpass Site altitude : 7,800 feet <br />Average ripping width : 7.08 feeUpass Altitude adjustment : 1.00 (Cat HB} <br />Average ripping length : 500.00 feeUpass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feeUminute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minuteslpass <br />Production per unit area : 0.822 acres/hour Adjusted unit production : 1,100.73 cu. yds./hour <br />Unadjusted production : 1,326.18 cu. yds./hour Adjusted fleet production : 1,100,73 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 1 dozers) Total job time : 21.99 hours <br />Unit cost : $0.140 per cu. yd. Total job cost : $3,381 <br />