Laserfiche WebLink
•: <br />c <br />MR. DAN MATHEWS <br />ALLEGED N.O.V. C-85-045 <br />JUNE 7, 1985 <br />PAGE TWO <br />7. Implementation of the approved sedimentation control plan addressed <br />in No. 3 above, will be dependent upon the ability of the Middle <br />Creek Pit area to sustain the heavy equipment necessary to construct <br />the approved plan. If soil conditions prohibit heavy equipment <br />activity in the area, the above requested extension may require mod- <br />ification. <br />CYCC has constructed diversion ditches on the upper portions of the <br />Middle Creek Pit area spoil in an attempt to divert the spring water away from <br />the lower portions of the backfilled pit area. These diversion ditches flow <br />into the present Middle Creek Detention Basin. This activity was conducted to <br />allow the lower portions of the backfilled pit area to dry out as soon as <br />possible. <br />If you have any questions concerning this request for abatement exten- <br />sion, please contact me at the above letterhead address. <br />Sincerely, <br />R.UC~.-e.~ ~la...~.2n <br />Richard Hughes <br />Environmental Specialist <br />RH:kmk <br />cc: G. Consalus <br />M. Kondelis <br />L. Damrau <br />