My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE20049
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE20049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:24:20 PM
Creation date
11/21/2007 9:42:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Enforcement
Doc Date
6/2/1993
Doc Name
REQUEST FOR NOV ABATEMENT DATE EXTENSION NEW ELK MINE PN C-81-012
From
BASIN RESOURCES INC
To
MLR
Violation No.
CV1993038
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mr. Joseph Dudash <br />May 28, 1993 <br />Page 2 <br />NOV C-93-040 - The majority of the items in this NOV have been <br />abated, however, an extension for the reclamation of the non-coal <br />waste disposal area is requested. <br />NOV C-93-041 - The majority of the slurry has been removed from the <br />face of the RDA, however, the final cleanup is still in progress. <br />An extension for this NOV is requested. <br />NOV C-93-042 - All required hydrologic monitoring is currently <br />being preformed according to the schedule. An extension for <br />submittal of the revised pages of the permit document is requested. <br />NOV C-93-043 - Haul road certification information has been <br />submitted. RDA field testing has been completed and the <br />certification will be provided as soon as it is received from the <br />contractor. In our May 25, 1993 letter, an extension for the <br />testing of the underground development waste pile was requested. <br />Certification will be provided on a quarterly basis. All maps will <br />be certified and provided as NOV responses are completed. <br />NOV C-93-044 - An extension for the submittal of a TR for the <br />stabilization of road fill slopes is requested. <br />NOV C-93-058 - A portion of the disturbed material placed outside <br />sediment control structures has been relocated to controlled areas <br />and a portion of the ditches have been upgraded. An extension to <br />complete the activities required is requested. <br />NOV C-93-059 - The Pond 6 embankment has been regraded as required. <br />An extension for the Pond 7 inslope work is requested. <br />NOV C-93-060 - The majority of the items in this NOV have been <br />completed. The final certification by the engineer will be <br />completed by 6-30-93 and submitted to the Division. <br />NOV C-93-061 - An extension to submit the demonstration for SAES at <br />the West Portal is requested. <br />NOV C-93-062 - An extension to submit a TR for the road design and <br />associated drainage is requested. The majority of the road ditches <br />have been cleaned. <br />NOV C-93-063 - An MR to expand the size of coal stockpile areas has <br />been submitted. <br />NOV C-93-064 - An extension to submit the revision required for <br />Stipulation 29 addressing the reclamation of roads is requested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.