Laserfiche WebLink
M93040GE <br />engineer to observe foundation excavations and for additional site <br />visits to test compacted soil. <br />It is difficult to predict if unexpected subsurface conditions <br />will be encountered during construction. Since such conditions may <br />be found we suggest that the owner and the contractor make <br />provisions in their budget and construction schedule to accommodate <br />unexpected subsurface conditions. <br />6.0 LIMITATIONS <br />It is the owner's and the owner's representatives <br />responsibility to read this report and become familiar with the <br />recommendations and suoaestions presented. We should be contacted <br />if any questions arise concerning the geotechnical aspects of this <br />project as a result of the information presented in this report. <br />The recommendations outlined above are based on our <br />understanding of the current construction, observations of the <br />conditions of the slope and a review of existing subsurface boring <br />loos by others. We are available to discuss the details of our <br />recommendations with you, and revise them where necessary. This <br />geotechnical engineering report is based on the scone of services <br />as requested by Mr. Karl Koehler, existing site conditions at the <br />time of the field study, and on our findings. Should the planned,. <br />proposed use of the site be altered, Lambert and Associates must be <br />contacted. since any such changes may make our suggestions and <br />7 <br />~Lamberr ana~,ssociates <br />COrvSULLrvG GEOiECR HiG LL ErvG~rv EERS Lrv0 <br />MGiE RILL ~ESi1XG <br />