Laserfiche WebLink
REC~~~E® <br />saN s i9aa <br />MINED LAND <br />R~~Mp,TION DIVISION <br />Kati a »aa <br />~~S.uL i } <br />January 2, 1988 <br />William P. Balaz, P.E. <br />Kaiser Coal Corporation <br />102 S. TeSon St., Suite 800 <br />P. o. Boz 2679 <br />Colorado Springs, Colo. 80901-2679 <br />Dear Mr. Balaz: <br />As per my letter to and answer from CMLRD and my <br />telephone conversation with you last Wednesday Dec. 30th, I <br />am writing this letter. <br />The bridge or culvert that is now in place, across <br />Hubbard Creek, on the Blue Ribbon property is in the same <br />location that we have always maintained a bridge over the <br />years. <br />There has always been a bridge and road used as a <br />livestock crossing to reach our fee and BLM grazing acreages <br />which lays on both side s: of the Hubbard Creek canyon. <br />If possible we would like to preserve this crossing <br />for our future mining plans and livestock crossing. <br />Any attention or help from you that might aid in pre- <br />serving the bridge or culvert from the present reclamation <br />work would be greatly appreciates. <br />Sincerely, <br />~~ .vd~ •G~'+r <br />G. H. Allen <br />cc: CMLRD <br />Jim Stover <br />