Laserfiche WebLink
<br />1 <br /> <br />1 <br /> <br />lJ <br /> <br />1 <br /> <br />1 <br />1 <br /> <br /> <br />1 <br /> <br /> <br /> <br /> <br /> <br />Other equipment and facilities at the Incas Mine could include <br />air driven drills, generators, compressors, 4ue1 tanks, <br />porta62e radio phone, and mucking machines if underground <br />mining becomes feasible. <br />As the pit develops into areas where top soil exist, the oil <br />will be stockpiled in areas of the pit which have already e <br />exhausted of commercial ore deposits. Since the area <br />available for mining is restricted by the local topography, <br />the soil stockpile maybe relocated as mining conditions <br />require. However, when vlaced the soil will be on topographic <br />flattened areas, and if necessary, 95eeded and mulched to <br />insure stockpile stability. 17p No'^~ ' <br />The mining operation does not require any use of water and <br />should not contact any water resources (see E::hi6it @). To <br />date, the mining operation is dry and it is not exvected that <br />future overations will encounter any around water. <br />In summary, the proposed operation will not add appreciably to <br />the already disturbed conditions at the mine site. The total <br />area considered for redisturbance is less than seven acres <br />(6.64 acres). Less than half of the access road is located on <br />the Incas Claim @loc4::: however, if the Mined Land Reclamation <br />Division wishes to consider the entire access road as Dart of <br />the disturbed lands, the total roadway is less than three <br />acres (x.94 acres). This would be unreasonable since most of <br />the route is controlled by other landowners and use, <br />maintenance, disturbance, etc. on other properties can not 6e <br />managed by the applicant. <br />The proposed mining operation will probably be completed in <br />two or three years. However, if underground deposits warrant, <br />mining could continue for several more Years. As a result. <br />the applicant considers ten years as an appropriate time frame <br />to complete all proposed and anticipated mining and <br />reclamation activties. <br />5~ ''N~ <br />~~` <br />-e •% g <br /> <br />