Laserfiche WebLink
Colorado Div reion of Minerals and Geology <br />ESTIMATING FORM - EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />Task p... 240 Prep. by SLD Frlename..C007-290 <br />Dace..... 28-Apr-97 Permi[ k C-80-007 Mine......West Elk Mine <br />Permit Action........ Permit Revision No. ] <br />Task Description..... Mobilize additional equipment for PR 07 reclamation <br />___________________________________________________ <br />HOURLY EQUIPMENT COST <br />sheet 1 of Z <br />NOTE - This is a list Co select from, not a list of mandatory items co Include. <br />Mob/Demob Eqp. -Tractor 6x4, 75,000 16 GVW, 375 HP, diesel powered <br />-Lt. Trailer 25 ton folding gooseneck, drop deck <br />-Med. Trailer 50 [on folding gooseneck, drop deck <br />-Hvy. Tra rler 120 Ton folding gooseneck, drop deck <br />-Pilo[ Car On-highway light duty [ruck, 4x2, 130 hp, 1/2 [on rating, gasoline powered <br />-Hyd. Crane Grove RTSBD rough terrain hydrau lic crane, 20 [on capacity, 125 hp, 60 ft. boom <br />-Fuel Truck 6x4, 3,600 gallon capacity, 210 HP, diesel powered <br />-Cube Truck 6x9, 2,500 gallon capacity, 210 HP, diesel powered <br />-Flatbed Truck: 20,000 lb GVW, 1]5 HP, diesel powered <br />Last update: __ ___________________ ______________ ____________ _________________ __________ <br />December, 1999 <br />--- Lt. Rrg Med.Rig Hvy.Rig Pilot Hydraulic Fuel Lube Flatbed <br />Cos[ Breakdown: <=25 T. 26-SO T. a 50 T. Cat Crane Truck Truck Truck <br />Ownership Cost/hr = $27.88 $31.23 538.36 $1.81 $19.89 $6.95 $12.79 $5.71 <br />Operating Cos[/hr $26.89 $29.29 $]4.27 $5.12 $23.90 $18.53 $24.52 $8.00 <br />Operator Cos[/hr = $21.40 $22.03 $22.07 $21.29 520.86 $21.29 $21.24 $21.29 <br />Helper Cosc/hr = $20.60 $21.29 $21.29 $0.00 $0.00 $0.00 50.00 $0.00 <br />Total = 596.72 5103.79 $115.90 $28.17 $64.15 $46.72 $58.55 $34.95 <br /> <br />NON-ROADABLE EQUIPMEN _______ <br />T: _______ _______ _______ _______ _______ _______ _______ <br />--------------------- - Weigh[ Ownership Haul Rig Fleet 51 ze Haul Trip Aeturn Trip DOT Pe rmi[ <br />Machine Descrip[ion ~tonsl Cost/hr Cost/hr (no. hauled) Cost/hr Cosc/hr Cost/ea <br />Grove RT-]96 Crane 30.00 $66.30 $103."!9 1 $1]0.09 $103.79 ' <br />Ca[ 12G Grader 15.90 $18.15 $96.]2 1 $119.8] 596.72 <br />Subto[als $2 E4 .96 $200.51 50.00 <br />