Laserfiche WebLink
Colorado Div iston of Minera le and Geology <br />_________________________________________ <br />ESTIMATING FORM - TRUCK/LOADER TEAMS <br />Task No. 227 Prep. By: SLB Permit No. C-BO-007 <br />__________ _________ ________ <br />Date 04/28/97 Filename: 0007-227 Operation: West Elk Mine <br />__________ _________ _____________ <br />Permit Action Permit Revision No. 7 <br />Sheet 1 of 3 <br />Task Description Haul backf ill material for main access Sta. 60-78 <br />HOURLY EQUIPMENT COSTS: <br />______________-_:___= Single, Double or Triple <br />Cozen cy: GUNNISON Labor Zone 2 Shifts S <br />Equipment Descriptions <br />Truck/load team - Tn ck GENERIC lOt, 7.E to 10.4 cy, on or of E-highway <br />- Loader CAT 966E <br />Support equip. - Load area: CAT DBN with SEMI-U blade <br />- Dump area: CAT DBN w1[h SEMI-U blade <br />Road main[. - Grader N/A <br />- Water T. N/A <br />___________________________________________________ <br />Truck/Load Team Support Equipment Road Maintenance <br />Truck Loader Load area Dump aYea Grader Water T. <br />Equipment Filename: lOCYHLTK 966FLODR DBN-S DZR DRN-SDZR N/A N/A <br />________ ________ ________ ________ _________ _______ <br />Utilization on job <br />-Machine: 96k 100k 1004 100k N/A N/A <br />-Ripper N/A N/A N/A N/A N/A N/A <br />C09C IlredkdOWn <br />Ownership cost/hr: $12.90 526. 89 590.05 590. 05 N/A N/A <br />Opexat ing cost/hr: $19.58 $24. 25 $51.67 $Si. 67 N/A N/A <br />Ripper Op. cos C/hr: 50.00 $0. 00 $0.00 50. 00 N/A N/A <br />Operator cost/h r: 520.97 $22. 09 $22.95 $22. 95 N/A ~~N/A <br />Unit subtotals $48.45 573. 17 $119.67 $119. 67 N/A <br />_ N/A <br />_ <br />________ <br />q of eqp. units 4 <br />____ ______ <br /> <br />__ __ <br />1 <br />__ ________ _ <br />1 <br />____ _____ <br /> <br />__ __ <br />1 <br />__ ____ <br />____ <br />0 <br />____ _____ <br />_ <br />0 <br />____ <br />Group su b[o[als- T/L team $266. <br />__ 97 <br />_ Support: <br />__ $229. <br />___ 33 <br />_ Rd. Maint.: $0.00 <br />______ <br />Total Work Team Cost/Hr _____ <br />$496. _ <br />]0 __ _ __ <br />MATERIAL QUANTITIES: <br />Beg. <br />Volume: 45,000 CCY <br />Cu.Yd. ---------- Swell Loose <br />Volume: 45,000 CCY Fac [o r . 1.165 Volum e: 52,425 LCY <br />__________ <br />Source of quant rty cake-o Ef: <br />Table 2 <br />of __________ <br />Exh. 69 ___________ <br /> <br />Source of es[. swell factor: ______________________ <br />Division estimate, SOk _____ <br />rock ___ <br />- ___________ <br />60k dirt _________ <br />