Laserfiche WebLink
2~ <br />Tn ck Cycle Time Sheet 3 of 3 <br />________________ <br />Exchange = 0.60 min. Adj. Eor altitude = 0.60 min. <br />Load = 0.520 min. " " " = 0.52 min. <br />Maneuver fi dump = 1.00 min. " " = 1.00 m1n. <br />Travel Time (haul fi return): <br />Road cond. descr.:RUtted dirt road, little/no main[., 1-2" tyre penetration <br />Haul route <br />Road Length Grade Rolling Total Velocity Travel time <br />seg. p Ift) res. (k) res. (tl res. (tl (fpml lmi n) <br />______________________________________________________________________ <br />1 1.000 10.00 5.00 15.00 616 1.66 <br /> Haul Cime = 1 .66 min. <br />Return route --- --- <br />___________________________ <br />1 1,000 -10.00 _________________________________ <br />5.00 -5.00 3520 ______ <br />0 ___ <br />.99 _ <br />•lst b last seg. adj. for accel./decel. Return time = 0 .99 min. <br /> Total Truck Cycle T1me = 9 .27 mm. <br />Loader Unit Prod.= 921.88 LCY/Hr - Adz. for efficiency= 350. 16 LCY/Hr <br />_________ <br />Truck Uni[ Prod.= 110.57 <br />LCY/Hr - Adj. for efficiency= ______ <br />91. __ <br />78 <br />LCY/Hr <br />_________ <br />Optimal number of trucks per loading unit ______ __ <br />4 <br />Selected number of tacks per loading unit 4 <br /> Hourly Cnck Ceam production 367. 11 LCY/Hr <br />NeC Hourly Tnck/Loader Team Production 350. 16 LCY/Hr <br />Net Hourly Multiple T/L Team Production 350. 16 LCY/Hr <br />JOB COST: <br />Fleet size 1 T/L Team(s) Total Job Time: 99. 91 Hours <br />________ <br />Unit Cost $1.41] <br />________ <br />/LCY Total Job Cost: <br />_ _________ <br />929,]66 <br />_________ <br />