Laserfiche WebLink
Mr. Berhan Keffelew <br />December 22, 1989 <br />Page 2 <br />Bond Estimates <br />Truck Dum <br />0 <br />0 <br />Conveyor <br />0 <br />Steel Structure 14' X 12' X 9' = 1512 cubic feet <br />1512 cubic feet X $0.14 = $ 212.00 <br />Approach and Exit Ramps (identical to TR-16) <br />1500 cubic yards X $1.00/cubic yard= $1,500.00 <br />Conveyor Removal 90' X 4' = 360 sq. ft. <br />360 sq. ft. X $1.80/sq. ft. = S 648.00 <br />Total Bond Increase $2,360.00 <br />As stated, this is a temporary arrangement which will provide WFC <br />the capability of handling customer quality coal. in a cost <br />effective manner. It is estimated that the temporary truck dump <br />and conveyor would be used for a period of 6 months. This period <br />would provide WFC the necessary time required to conceive, develop <br />plans, obtain construction costs, permit and construct a coal <br />handling system which will serve long range goals. <br />Should you have any questions regarding this revision request, <br />please let me know. <br />Si erely, <br />~. <br />Gr E. on <br />Envir ental Coordinator <br />GEJ:bb <br />Attachment <br />