My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV06807
DRMS
>
Back File Migration
>
Revision
>
REV06807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:07:48 AM
Creation date
11/21/2007 9:37:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
12/22/1989
Doc Name
TR REQUEST NO 18 NEW ELK MINE C-81-012
From
WYOMING FUEL CO
To
MLRD
Type & Sequence
TR18
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III <br />999 <br />UJ~oming Fuel Com~an~ <br />Golden Eagle /New Elk Mines <br />10250 Highway 12 • Weston, Colorado 81091 • Telephone (719) 868-2761 <br />December 22, 1989 <br />Mr. Berhan Keffelew <br />Reclamation Specialist. <br />Colorado Mined Land Reclamation <br />1313 Sherman Street <br />Denver, CO 80203-2273 <br />.~--H*C ICAL <br />RE: Iii-rrer Revision Request No. <br />~~~~r~~~ <br />o~c zz ~eeo <br />MINED L,gNp <br />Division RECLAMATION DIVISION <br />~'l, New Elk Mine C-81-012 <br />Dear Mr. Keffelew: <br />As per discussions with yourself and Mr. Waldron, Wyoming Fuel <br />Company (WFC) is requesting a minor revision to construct a <br />temporary truck dump and conveyor. This temporary arrangement is <br />urgently needed to provide WFC a means of handling spec coal <br />trucked from the Golden Eagle Mine. <br />The truck dump approved as part of TR-16 will still be constructed <br />to more effectively handle raw coal conveyed to the plant feed <br />stockpile area. The spec coal conveyor proposed in TR-16 will not <br />be constructed due to higher than expected construction costs. <br />The temporary truck dump and conveyor proposed is illustrated on <br />the attached site plan and described below. <br />Truck Dump <br />The truck dump will be constructed from structural steel which will <br />allow truck crossover and dumping into an 18-ton hopper. The <br />approach and exit ramps will be constructed from compacted earth <br />fill identical to the truck dump approved in TR-16. The design <br />dimensions of the dump structure are 14' long X 12' wide X 9' high <br />or a total of 1512 cubic feet. <br />Conveyor to Transfer Buildin4 <br />Coal which is of customer quality will be conveyed via a 42" <br />conveyor from the truck dump to the existing transfer building. <br />Once inside the building a transfer chute will place the coal on <br />the existing silo conveyor. <br />Civil improvements to the area will again include excavation, fill <br />and grading of areas to accommodate the truck dump ramps and <br />maintain the approved Surface Water Control Plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.