Laserfiche WebLink
Mr. MiebaelBoutay <br />Di°i.rion of MrneraG and Geology <br />Derember [2, 2003 <br />Aagc 2 <br />• Response: There is a reference to embankment protection on Exhibit 13-SB in the note under the <br />capacity table which states "Embankment crest and outslopes revegetated with approved temporary <br />grass seed mix." We have also referenced embankment protection in the enclosed Attachment 13-1 $, <br />Sedimentation Pond 011A Stability Analyrir. <br />6. Drawing 13-SB rhowr a 3-inch dewatering orifice on the principal rpi!lway, however, this it not accounted for in <br />the SEDCAD run. If appropriate, pleare remove the dewatering orifice from the derign drawing. <br />Response: Exhibit 13-5B has been revised to delete reference to the 3-inch orifice. <br />Please add a dircurrion of Pond O11A to the Sedimentatoon Ponds section of Tab 13-Facilities. At a minimum <br />this section rhoukl be updated an pager 4 and 11 of Tab 13to inrorporate Pond 011A into the Sedimentation <br />Pond section. <br />Response: Discussion of Pond 011A has been added as requested. <br />$. The text of foatuote 4 should be changed to read 18% iurtead of 19%. If appropriate please make tbzr change to <br />footnote 4. <br />Response: This update has been made and a revised Exhibit 13-12.3 is included in this submittal. <br />9. A curve number of 56 war previously approved and ured in the Pond 011 derign for the undisturbed area/rah <br />watershed located between the proposed Pond O11A and existing Pond 011. In the YPM-12 SEDCAD run a <br />• curve number of 50 war ured. This Curve number a not included in either of the approved Curve number tablet for <br />Yoart (Tablet 13-1 and Table 13-12.1). Please explain this apparent discrepancy and describe what effect this <br />may have on the YPM-12 drainage derign. If necessary, please ad'urt the SEDCAD derign utilizing an <br />appropriate Curve number. <br />Response: The curve number has been revised and a new SEDCAD run is attached. (Note that the <br />Curve number revision made no difference in the drainage derign.) <br />10. A derign bat not been rubmined far an acceu road or light-uae road to the proposed Pand O11A. Haw will this <br />pond be attested in the future for quarterly inspections, cleaning, routine maintenance, etc? <br />Response: Exhibit 12-1, Operations Plan -Mining, has been updated to show a location for a light use <br />road to access Pond O11A. The road will be constructed according to the guidelines discussed in Tab <br />13 under "Light-Use Roads: <br />71. SCC hat indicated that a barkboe and other small equipment will be ured to ronrJruct YPM-12. Although <br />minimal, there will be additional disturbance associated with the coratrurtion of YPM-12. Please provide a plan <br />and schedule for repairing the dirturbance associated with the use of a backhoe and other equipment along the <br />YPM-12 drainage and amy attest router into this location. <br />Response: A discussion of the additional disturbance and proposed reclamation has been included in <br />the Tab 20 text. <br />• <br />