My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV05982
DRMS
>
Back File Migration
>
Revision
>
REV05982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:04:41 AM
Creation date
11/21/2007 9:30:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Revision
Doc Date
1/21/1994
Doc Name
MEMO RIGHT OF SUCCESSIVE RENEWAL/CONTINUATION OF OPERATIONS
Type & Sequence
RN2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FROM natural TO~OMG <br />Mike Long <br />Page 2 <br />is not the original permittee, bu <br />both of which have been renewed e <br />ration date for both permits is J <br />notification to Basin on April 19 <br />both permits and the necessity of <br />tions to DMG in a timely manner. <br />plicationa on September 1, 1993. <br />plicationa and determined that ad <br />nary for both. DMG notified easi <br />renewal applications and has recs. <br />DMG has not yet made a proposed o <br />renewal applications, No person <br />sires party statue to these renew <br />that the Division will issue a pry <br />January 26-27, 1994 Mine Land Rec' <br />Basin has submitted a request for <br />posed decision and a request for 1, <br />sions of Rule 2.07.4(3)(d). <br />Legal Analysis <br />6ection 109(7)(a) of the Colorado <br />Act (Act), Section 34-33-109(7)(a <br />tee "the right of successive rene~ <br />to permit areas." The permittee i <br />and, "such renewal shall be issuei <br />notice requirements have been metlI <br />demonstrated to exist. Id. The I <br />tions ie on DMG or any t)~rd part <br />Subsection 107(7)(d) provides the; <br />renewal shall apply for such rene~ <br />expiration of the existing permit, <br />at least 90 days prior to the 18oj <br />to renew. Id. There is no explic <br />cation, for a permittee'e failure <br />placation in accordance with the <br />2.08.5{2) of the Regulations rei' <br />statutory provisions. Like the Ac <br />preasly provide any sanctions for <br />day requirement. <br />JRN 21. 1994 5~29PM t+174 P.03 <br />t succeeded to these permits, <br />:veral times. The permit expi- <br />snuary 25, 1994. DMG mailed a <br />1993 of the expiration date o <br />sending its renewal applica- <br />Basin submitted its renewal ap <br />DMG reviewed both renewal ap- <br />)itional information was neces- <br />~ of the inadequacies of its <br />qtly received responses to them <br />final determination on the <br />gas yet indicated that 1t de- <br />ll applications: Anticipating <br />posed decision prior to the <br />.amation Board (NLRB) hearing, <br />a formal hearing on the pro- <br />:emporary relief under provi- <br />f <br /> <br />Surface Coal Mining Reclamation <br />-, C.R.S., grants a coal permit- <br />,+al upon expiration with respect. <br />nay apply for a permit renewal <br />!" to the permittee if public <br />unless certain conditions are <br />wrden of showing such condi- <br />+ challenging the renewal. Id. <br />a permittee desiring a permit <br />+al at least 180 days prior to <br />DMG must mail to the permittee <br />day period .notice of the need <br />:it sanction, e.g. permit revo- <br />to file its permit renewal ap- <br />.80 day requirements. Rule <br />:e rates the above-referenced <br />;t, the Regulations do not ex- <br />failure to comply with the 180 <br />Section 109(i) of the Act, 6ectio~ 34-33-209(I), C.R.S., also <br />provides that a permittee who hasieubmitted an application for <br />renewal in accordance with the 18D day and other requirements set <br />forth in that section "May conduct such operations beyond such <br />r~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.