Laserfiche WebLink
EXHIBIT L <br />RECLA1dATI0N COSTS <br />The two consecutive phases requiring the greatest amount of <br />reclamation work are Phases I and II (35.00 acres + of bank slope <br />grading, and 13.91 acres + of revegetation). Costs of reclaiming <br />the area distrubed in Phases I and II have been estimated based <br />on the following data: <br />1. Grass seed mixture, 915 lbs/ac. @ $1.44/lb. <br />Fertilizer mixture, 100 lbs. AgriChem (N2) <br />(18-46-0) @ ..°P9.60 per 100 lbs., and SO lbs. <br />• • AgriChem (P205) (34-0-0) @ $5.80 <br />Mulch (straw), 6S bales/ac. @ $0.70/bale <br />Labor*, 16 man hrs./ac. @ $6.00/hr. <br />Per acre total <br />2. Seed mixture drilling and mulch crimping, <br />labor, 1.00 hrs./ac. @ $40.00/hr. <br />3. Slope grading and reshaping, 2 hrs.jac. @ $40.00/hr <br />4. Trees** - 145 Russian olive and 30 cottonwood <br />175 total @ $0.85 each <br />Thus, reclamation costs for the combined acreage in <br />Phases I and II are as follows: <br />Revegetation, 13.91 ac. @ $172.98 <br />Seed mixture drilling and mulch crimping, 13.91 <br />ac. @ $40/ac. <br />w 13.GS <br />15.70 <br />47.60 <br />96.00 <br />172.98 <br />40.00 <br />so.oo <br />148.75 <br />$2406.15 <br />556.40 <br />Slope grading and reshaping, 35.00 ac. @ $SO/ac. 2800.00 <br />Trees Total Cost 145.75 <br />TOTAL RECLAMATION COSTS, PHASES AND 5911.30 <br />Plus lOm for state overhead 591.13 <br />TOTAL $6502.43 <br />* Labor includes tree planting. <br />** Phases O thru Z will include the planting of 482 Russian <br />olive and 97 cottonwood trees. <br />57 <br />