Laserfiche WebLink
<br /> <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br /> <br />Agency or organization name : DMG ~ <br />Task # : 106 State : Co/oraoo Permitlob# : M-85023 <br />Dale: f217~J9 County:Gunn/son Abhraviation :none <br />User: RCO Sile: HO//enbeck Pit Filename:M023-106 <br />Permit or other joh action :final Reclamal/on - revisetl <br />Task description :Spread topsoil from W sioc)tplle over upper pit <br />HOURLY EQUIPMENT COST Basic machine: Cal DBN (1996) - Horsepower: 285 <br />Blade type : feml-Universal <br />Attachment no. 1 : ROPS Cab Shifl basis : pertl <br />Attachment no. 2 :3-shank ripper <br /> Utilization :4 Cost data source : CRG) <br />Cost Breakdown: Ownership cosUhour: f41. f0 NA <br />Operating cosUhour : f55.64 100 ' <br />Ripper op. cosUhour: f0.00 0 <br />Operator cosUhour: 323.72 NA <br /> <br />Total unit cosUhour: <br />5119.86 <br />Total Oeet cosUhour J <br />: 5 <br />119.88 <br />MATERIAL OUANTI71E5 <br />Initial <br />volume: 1,111 CCY <br />Source of quantity take-ofl :Ins{ <br />~~ss~~ Souroe of est. swell factor : Na <br />..~euE~.A~ <br />HOURLY PRODUCTION <br />Average push distance: 63 /eat <br />Swell <br />lector: 1.125 <br />tlon 1299 <br />Operator skill <br />Matedal consistency <br />Dozing method <br />Ysihility <br />Jah eRcienry <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Unadjusted hourly production : 1051 LCY/hr <br />Material consistenry description <br />Orv. nonioheslve <br />Average push gradient : 0.00 %(Iws) <br />Average site altitude : 7,800 teal <br />Material weight : 2,950 Ibs/LCY <br />Material weight description <br />5(ac -broken <br />Loose <br />volume : 1,250 <br />Net correction <br />Adjusted unit production <br />Adjusted Oeet production <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job lima <br />Unit cost : 80.490 /LCY Total job cost <br />0.75 <br />O.BO <br />1.00 <br />1.00 <br />0.83 <br />0.60 <br />1.00 <br />1.00 or UJ <br />0.23 <br />244.80 LC /hr <br />244.80 LC <br />.._:.~ r~T` <br />5.11 Ha /hr <br />... <br />rs <br />ea r~ <br /> <br />