Laserfiche WebLink
<br /> <br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Agenq or organization name : DMG <br />Tasktl: 104 State:Co/o2rb PermiVjo6if:M-8b023 <br />Date : 1Y17N9 County :Gunnison Abbreviation :none <br />User: RCO Sile :HOllenbeck Pit Filename: M023-f04 <br />Permit or other job action :Final Rec/amaflon -revised <br />Task deacription :Rip roads and lower pad for compaction <br />- ;.,n.., ~,: s~ <br />HOURLY EQUIPMENT COST Basic machine :Cef D8N (1996) Horsepower <br />Blade type : Semi-Universal <br />Adachmenl no. 1 : ROPS Cab Shifi hasis f <br />Abachmenl no. 2 : 3-shank hyper <br />Utilization Ye Cosl data source <br />Cost Breakdown : Ownership cosOhour : 241.10 NA ~ <br />Operating cosVhour : 555.64 100 <br />Ripper op. cost hour : 26.94 100 <br />Operator costAtour: 223.12 NA <br />Total unit cosUhour : 2726.80 Total geet cosOhr : $ <br />Seismic <br />method <br />Area <br />method <br />Selected estimating method : A/ea <br />285 <br />NA NA Load factor : NA Bank volume : NA BCV <br />2.00 Acres Rip depth (N): 1.50 volume : 4,840 CY or CCY <br />Source o! quantity takeo8: InSi <br />Source of material load lector : NA <br />... 1~:L?ru^ <br />HOURLY PRODUCTION <br />Seismic method <br />Area method : <br />Correction lectors <br />Material seismic velocity : NA feet per second ~ <br />Unadjusted houdy production : NA BCY or CCY/hr <br />Average ripping depth per pass : 1.50 leer <br />Average ripping width per pass : 7.OB lest ~ <br />Average ripping length per pass : 300.00 leer <br />Average velocity of machine : 88.00 feel per minute <br />Average machine maneuver time /pass : 0.25 minutes <br />Hourly production par unit area : 0.800 acres par hour <br />Unadjusted houdy production : 1,974.91 BCY or CCY/hr <br />Unadjusted houdy production : 1,934.91 BCY or CCY/hr <br />Site altitude : 7,800 leer <br />Altitude adjustment : 1.00 (Cef HB) <br />Job efficiency factor: 0.83 (1 shlNUayJ <br />Nel job cortectien : 0.83 multiplier <br />Adjusted houdy unit production : 1,605.97 BCY or CCY/hr <br />Adjusted heurty Oeet production : 1,605.97 BCY or CCY/hr ~ <br />JOB TIME AND COST <br />Fleet size : f Dozers) Total iob time ~ 3.01 ours <br />Unit cast : 20.079 /LCY Total job cost : $382 <br />- _.>_ <br />.w,;: ,~;h.~ ~. <br />