<br /> <br />• 1.0 INTRODUCTION <br />This document presents the as-built condition of the evaporation system at the San Luis Project <br />located neaz San Luis, Colorado. This report discusses key features of the as-built construction, <br />presents construction quality assurance (CQA) and control results, and provides supporting <br />documentation in the appendices. As-built drawings of the evaporation system aze also included. <br />The controlling documents for the construction of the evaporation system ware the Interim <br />Evaporation Pond System Design Report (BMRI, 1999) and the Battle Mountain Resources <br />Technical Revision Number 26 (BMRI, 1999). The methods of CQA testing, documentation, <br />and design modification were according to the procedures outlined in the construction <br />specifications presented in Appendix C of the design report. <br />Construction of the evaporation system was performed under contract by SLV Earth Movers, <br />Inc. of Monte Vista, Colorado, and included prepazation of subgrade, excavation of borrow <br />material, placement of fill, and construction of the piping system. Liner installation was <br />• performed by National Seal Company of Reno, Nevada. Earthwork CQA and overall project <br />engineering services were provided by Shepherd Miller, Inc (SMI). <br />The work was performed between June 4 and July 14, 1999. The diversion ditch was constructed <br />between June 4 and 9, with riprap placement between June 14 and 18. Earthworks in the holding <br />pond and evaporation azea were completed between June 7 and June 15. Liner installation <br />commenced June 14 in the evaporation azea and was complete in the holding area on June 24. <br />The evaporators and appurtenant pipeline, pumps and electrical equipment were installed <br />between June 14 and July 1. Detail plumbing and electrical, commissioning, and final <br />troubleshooting were completed by July 14. <br /> <br />Battle Mountain Resources, Inc. I August 20, 1999 <br />