My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV05737
DRMS
>
Back File Migration
>
Revision
>
REV05737
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:04:21 AM
Creation date
11/21/2007 9:27:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
1/14/1994
Doc Name
EMMISION PERMIT
Type & Sequence
MR113
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNTAIN COAL CO/WEST ELK MINE <br />Permit No. 13GUO34-1 <br />Initial Approval <br />Page 3 <br />16. This source is subject to New Source Performance Standards requirements of Regulation No. <br />6, Part 60 ,Subpart Y, Standards of Performance for Coal Preparation Plants as follows: <br />Any affected facility, which includes all coal processing and conveying equipment, <br />storage systems, and transfer and loading systems shall not cause or to be <br />discharged into the atmosphere gases which exhibit 20°h opacity or greater <br />In addition, the following requirements of Regulation No. 6, Part A, Subpart A, General <br />Provisions, apply. <br />a. No article, machine, equipment or process shall be used to conceal an emission <br />which would otherwise constitute a violation of an applicable standard. Such <br />concealment includes, but is not limited to, the use of gaseous diluents to achieve <br />compliance with an opacity standard or with a standard which is based on the <br />concentration of a pollutant in the gases discharged to the atmosphere. (§ 60.12) <br />b. Written notification of construction and initial startup dates shall be submitted to <br />the Division as required under § 60.7. <br />c. Records of startups, shutdowns, and malfunctions shall be maintained, as required <br />under § 60.7. <br />d. Written notification of opacity observation or monitor demonstrations shall be <br />submitted to the Division as required under § 60.7. <br />e. Compliance with opacity standards shall be demonstrated according to § 60.11. <br />A copy of the complete applicable subpartlsl is attached. <br />By: ~~- rn~~ <br />Thomas M. Tistinic <br />Permit Engineer/Reviewer <br />Dale of Final Approval: 6/23/69 <br />Modification: <br />By: i~~ ~ G =J. <br />James S. Geier, P ., Chief <br />New Source Review Section <br />Stationary Sources Program <br />Air Pollution Control Division <br />Nema change, addition of a naw crusher & 800 ft of conveyor, <br />increase in production from 1200 tans/hour & 1.44 million tons/year to <br />1500 tonslhour and 4.2 million tons/year <br />51/15/3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.