My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-05-03_REVISION - M1994092
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994092
>
2006-05-03_REVISION - M1994092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:14:41 PM
Creation date
11/21/2007 9:27:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994092
IBM Index Class Name
Revision
Doc Date
5/3/2006
Doc Name
Request for FW and PW
From
DMG ajw
To
Shane Cooper
Type & Sequence
SO1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : DMG <br />Permit or other job action : SO-01 <br />Task description : TOp5 <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cat D7R OS Series 1/- 7SU Horsepower : 240 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $43.17 NA <br /> Opereting cosUhour : $55.05 100 <br /> Ripper op. cosUhour : $0.64 10 <br /> Operator costfiour : $32.53 NA <br /> Total unitcost/hour : $131.40 Total fleet cosUhour : $131.40 <br />,. <br />MATERIAL QUANTITIES ;: .. s <br />Initial Swell Loose <br />volume : 4,000 LCY factor : NA volume : 4,000 LCY <br /> <br />Source of estimated volume :Inspection <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Cortection Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 175 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 464.9 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 j (ishiNday) <br />Loose stockpile Spoil pile : 0.70 (fid-mt) <br /> Push gradient : 1.43 (Cat HB) <br />Average push gradient : 20.00 °6 (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,500 feet Material weight : 1.44 ~ (Cat HB) <br /> Blade type : 1.00 ~ (S/SU/U) <br />Material weight : 1, 600 Ibs/LCY Net correction : 1.07 <br />Weight description <br />Top Soil <br />JOB TIME AND COS7 <br />Adjusted unit production : 498.22 LCY/hr <br />Adjusted fleet production : 498.22 LCY1hr <br />Fleet size : 1 Dozers) Total job time : 8.03 Hours <br />Unit cost : $0.264 /LCY Total job cost : $1,055 <br />
The URL can be used to link to this page
Your browser does not support the video tag.