My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-05-03_REVISION - M1994092
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994092
>
2006-05-03_REVISION - M1994092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:14:41 PM
Creation date
11/21/2007 9:27:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994092
IBM Index Class Name
Revision
Doc Date
5/3/2006
Doc Name
Request for FW and PW
From
DMG ajw
To
Shane Cooper
Type & Sequence
SO1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name :OMG <br />Permit or other job action : SO-0 <br />Task description : Bac, <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D7R DS Series ll - 7SU Horsepower : 240 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROAS Cab Shift basis : 1 per dey <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cast Breakdown : Ownership cosVhour : $43.17 NA <br /> Operating cosUhour : $55.05 100 <br /> Ripper op, cosUhour : $0.64 10 <br /> Operator cosUhour : $32.53 NA <br /> Total unit cosUhour : $131.40 Total fleet cost/hour : $131.40 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 4,000 LCY factor: NA volume: 4,000 LCY <br />Source of estimated volume :inspection <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUC710N Job Condition Correction Factors Source <br />Average push distance : 100 feet <br />Unadjusted hourly production : 714.3 LCY/hr <br />Material consistency description <br />Compacted (II or embankment <br />Average push gradient : 25.00 % (neg) <br />Average site altitude : 7, 500 feet <br />Material weight : 2,400 Ibs/LCY <br />Weight description <br />Clav and gravel - Drv <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.293 /LCY <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight :_ <br />Blade type :_ <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br />0.75 <br />0.90 <br />1.10 <br />1.00 <br />0.83 <br />0.70 <br />1.52 <br />1.00 <br />0.96 <br />1.00 <br />0.63 <br />HB) <br />447.81 LCY/hr <br />447.81 LCY/hr <br />8.93 Hours <br />'1,174 <br />
The URL can be used to link to this page
Your browser does not support the video tag.