Laserfiche WebLink
DOW COLD SPRIh1GS <br />~ , <br />n uts gy~t~ <br />1. Ground Water Inflows/Recharge 5. Evapora <br />2. Process Water - (4 Hr. Storage) 6. Percolat <br />3. Natural Precipitation/Runoff Loss <br />4. Irrigation Water 7. Dust Su <br />147 No .006 P.04 <br />a, a table <br />supporting <br />ve Loss <br />m -Seepage <br />on <br />Reclamation Resources should demonstrate that the water <br />management system is in compliance with the Fe eral Clean <br />Water Act (PL 92-500), Reclamation Resources sh uld commit <br />to compliance with the State Engineer's Office rega ding water <br />management and water rights for the proposed oper tion. <br />impoundment Desian <br />Recirculation impoundment design including dimensic <br />slopes should be provided for each phase of <br />operation, The design for each phase should be b~ <br />corresponding water balance. The design should t <br />minimum freeboard of 1.0 foot above the expected ma <br />surface elevation. Hydraulic calculations used <br />these designs should be included in each approp2 <br />balance. <br /> <br />TEL ?19-473-4060 <br />May 23,90 <br />Each water balance should include, at a mini <br />summarizing the following inputs and outputs a <br />calculations for each: <br />Please see changes to Exhibit G, Hydrology. <br />15. Water DivelsiOn <br />ns and side <br />.he mining <br />sed on the <br />llow for a <br />:imum water <br />to derive <br />iate water <br />An existing diversion from the Columbia Ditch and uried pipe <br />is indicated in Plate 2. Please provide a discus ion of the <br />diversion including diversion design, flow cap city, and <br />materials used in construction. <br /> <br />This request is addressed in Exhibit G, Hvdroloay <br />EXHIBIT E - Reclamation Plan <br />1. The statement is made in the reclamation plan that F <br />Resources, Inc., is not committing to reclaim ' <br />previously disturbed area of the North Central Ph <br />2.1.2(6) of the Minerals Rules and Regulations s <br />reclamation shall be required on all affected ~ <br />Division requests that Reclamation Resources commit <br />all previously disturbed land that will be re-mi <br />same land farm as described for areas that havR <br />previously disturbed. <br />`l ' <br />;lamation <br />e entire <br />.e. Rule <br />rtes that <br />ad. The <br />o grading <br />d to the <br />not been <br />Reclamation Resources will commit to grading all previously <br />