My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV05650
DRMS
>
Back File Migration
>
Revision
>
REV05650
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:04:14 AM
Creation date
11/21/2007 9:27:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
1/17/1997
Doc Name
LETTER
Type & Sequence
TR43
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SENT BY:Xerox Telecopier 7020 ~ 1-17-87 ~10:48AM ; <br /> <br />Blue Mountain Baergy <br />Deserado Mine <br />liangely, CO 81648 <br />970-675-8431-224 <br />TO: Dan Mathews <br />PR:7eff'Dubbert <br />DT; l/]7/97 <br />SB: Thiclmer water <br />3036755229y 1 303 2410336~it 1 <br />During the week of 1/13 the percent of clay solids bas bean rising rapidly. At the present time the <br />percent solids is 19%, which for clays in a thickner is very high. We have been running filter sake <br />to keep up with the clays is the thickner, but at this point the thickner concoatration is still very high. <br />The sad resuk ofthis problem is that our delivetied coal quality to the power plant is Homing about <br />9,800 BTUlIb. The wash coal product is presently rutmiag about 16% moisture, this is due to the <br />watx used to wash the coal contains a large amourR of days from the thickner. As long as we use <br />water with clay m it to wash the raw coal the deliveried product will eoatain n high amoum o£ water. <br />This is due to plays sticking to the wash coal screens and the coat particles being washed. <br />We are asking CMI.R to allow us to dump the thicknu water into the sealed area es speeifled in <br />TR43. It is my undmstartdmg that CMI.R has approved this techincal revision(TR43) to our permit, <br />but it will not ba formal approved until it is published and the tea day wmment period. <br />o ~~~,e un <T cif ~ i"~ ~'y /' /,Yaa t ~a-f li„f ~t -~3 4'~,. ~~t' <br />~,,.-,d~,a,~~1 ~l ~~G urn ~l. o ~ w 4 ~ ~ ~ Qti.c,~. ~'~~ ~ (1z~CJtio~~ ~ <br />-...___r <br />
The URL can be used to link to this page
Your browser does not support the video tag.