My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV05646
DRMS
>
Back File Migration
>
Revision
>
REV05646
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:04:14 AM
Creation date
11/21/2007 9:27:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974004
IBM Index Class Name
Revision
Doc Date
3/22/1982
Doc Name
FN 74-4
From
MOBILE PREMIX CONCRETE INC
To
MLRD
Type & Sequence
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />James McArdle <br />March 22, 1982 <br />Page Two <br /> <br />only occur in the following winter on one warm day. <br />Our present plan calls for the use of a water 1=ruck or <br />other similar system. <br />5. It is the intent of the operator to reclaim the: property <br />as best as possible so that it blends in with i:he <br />surrounding areas. We expect a survival rate i.n the <br />range of 5 to 10 percent or 525 to 1,050 trees and shrubs. <br />P,vi ~ 5 ~'~+-~ <br />B. Exhibit L - Reclamation Costs .G ~1 . <br />1. Reclamation Costs Per Acre ~~~ ~ ~e <br />a. The reclamation costs submitted were based on <br />Mobile Premix's costs to totally reclaim ttie property. <br />The intended final use of this property is commercial. <br />We intend to leave a final surface area that will <br />allow the placement of building footings, Etc. For <br />bonding purposes only, it is our opinion tY,at the <br />benches would be the only areas that may require <br />fill. This will allow for a better medium for tree <br />and shrub plantings. The maximum amount of bench <br />area at any given time will be approximately 15 <br />acres. The backfillina should be approximately 12" <br />or 24,000 cubic yards. It is our experience and <br />opinion that the $1.00 per cubic yard figure is too <br />high. Our costs are substantially lower ar.d we <br />suggest a compromise to 75C per cubic yard. This <br />gives you a total cost of $18,000 for the 15 acres <br />of backfilling. <br />b. As previously mentioned, our costs are based on <br />total reclamation. For bonding purposes, the <br />acreages from Phase V should be used. These represent <br />the maximum number of acres disturbed at any given time. <br />82.2 acres ripping at $160 per acre $13,152 <br />97.4 acres grading & shaping at $240 <br />per acre 23,376 <br />97.4 acres topsoiling & smoothing <br />at $1,210 per acre 117,854 <br />97.4 acres grass seed at $22.10 <br />per acre 2,152 <br />
The URL can be used to link to this page
Your browser does not support the video tag.