Laserfiche WebLink
RECLAMATION COS~MNARY cont'd sh~0 of 4 <br />K, PORTAL/SNAFT SEALING <br />Task No.) Task Description ) Cost (S) <br />ww.w.w .,, w.wM1.wwwwrw.wrww,wwrw,rw,rw.wM1rwwrw.r,rw.rwrw, w,w rM1r.,w,w„ <br />NA <br />, , <br />i , <br />rwrrwrwv lww r., wr wrwrwwrwwrwwrw rr rwwn4wYww M1wrwrM1wr4 ww M1wwwlw wM1'M1M1rM1w rh wlwrr <br />Subtotal (K): <br />------------ <br />L. DRILL H01E/NONITORIN6 HELL SEALIN6 <br />Task No.) Task Description ~ Cost (t) <br />M1M1ww.M1 M1,w ,M1wwwM1rw.w.r,ww„w,ww.ww.w,M1,rw,wwwM1w,.,M1w,r,r ,,, rw.w..M1.rM1 <br />"~ <br />NA <br />i 1 <br />4oM1r44o44oio M1wrM1rM1r4rrrwr wrr rrw ra rry wM1rrlrwrrwr/arM1rM14arr//r wrwwrrryrrlwir <br />Subtotal (L): <br /> <br />M. MISCELLANEOUS <br />RECLAMATION TASKS - ----------- <br />Task No.) Task Description ) Cost (5) <br />wM1wwrr M1,, www„M1M1w.rw,,.,,.M1,r..wM1M1r..w,M1w,M1rrw,ww.w,.wrM1w,w <br />'~ , wr.w,rw,M1, <br /> <br />4 ; DemolitionDispose of 5'x10'x10' mass Q 10.17/c.f.) i85 <br />5 )Seeding Fer attached Worksheet ) 11,249 <br />Fencing NA <br />6 {Mob/Demob Per attached worksheet ~ <br />wrrrM1wrwrr wr rw rr rrM1r4 rr wrrrrrrr M1nrr M1M1r rM1M1rrww rrM1M1M1 wrM1M1w M145M1M1rr 5598 <br />r4wM1M1wM1rrM1o <br />Subtotal (N): 11,932 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 14,056 <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 6 PROFIT <br />Item No.. Item Description Cost (5i <br />.w.w.w „ w w..M1.ww.,,w,wM1.wrrw.r,.wr.w,M1rrr r.r,...ww. wrr, r,r w..,.r.wr, <br />/ <br />1. ) Public Liability Insurance.... 1.SSOX of dir` ~ <br />t63 <br />2. ~ Contractor's Performance 0ond 0.975I of dir. ~ 540 <br />3. ~ Contractor's Profit........... 10.00X mf dir. ~ 5406 <br />4. ) Job Superintendent.. ~ SO <br />Subtotal IA): 1508 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 d PI: 54,564 <br />------------ <br />B. ONG PROJECT ADMINISTRATION EXPENSES <br />Item No.. Item Description Cost (tl <br />,rrr.r .,r .rr«r.M1rM1M1rM1rrr.,rM1,.rwrM1rrw,rwrrM1rwrM1r.M1rrM1r r,r rrrM1wrwrrM1 <br />1.~ ~ Contract Prep., Eng. Fees..... 4.25X of cntr.; / 1194 <br />2. )Staff Admin. Expenses......... O.75X of cntr.~ f34 <br />..,rrr.rr.M1rrwrrr.wwrwrM1,rwwr,.„wM1rwwr».wrM1wrw.w,rM1.,M1w.M1rrrM1r,wrrr.rr <br />NET INDIRECT COST PERCENTAGE: 18.ISX Subtotal fe): 1228 <br />w,M1,rw.rrr --------_--- <br />------------ <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 5736 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect casts): 14,192 <br />