RECLAMATION COS~IMARY cont'd shc~ of 4
<br />H. EARTHWORK -STREAM CHANNEL RECONSTRUCTION
<br />Task Na.~ Task Description Cost (S)
<br />,
<br />NA
<br />,
<br />,
<br />, ,
<br />Subtotal (Nl:
<br />I. EARTHNOR[ -DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL
<br />Task No,; Task Description Cost (SI
<br />, ,
<br />NA 1
<br />,
<br />, r
<br />~ ~
<br />,
<br />, r
<br />i
<br />i ,
<br />i i
<br />i ,
<br />i ,
<br />, ,
<br />i
<br />, ,
<br />i i
<br />, ,
<br />i ~
<br />, r
<br />i i
<br />r ,
<br />i
<br />, ,
<br />, i
<br />, t
<br />i i
<br />, ,
<br />i i
<br />i ,
<br />i
<br />i ,
<br />Subtotal (Il:
<br />------------
<br />J. EARTHWORK -TOPSOIL/SUBSOIL REPLACEMENT
<br />Task No.. Task Description Cost f!)
<br />3 ;Spread any available salvaged topsoil over the ) 4 1103
<br />south and east pit slopes.
<br />Assuae 2' cover over the 3.7ac. slope area
<br />1,000c.Y.
<br />,
<br />,
<br />,
<br />,
<br />,
<br />,
<br />~ ,
<br />,
<br />,
<br />,
<br />,
<br />,
<br />,
<br />,
<br />, ,
<br />,
<br />.,,,,,,,,',,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,SubtotalrylJ),,,,,,,,5103`
<br />
|