Laserfiche WebLink
~ i <br />Colorado Division of Minerals and Geology <br />ESTIMATING FORK - EDUIPMENT NOBILI2ATION / DEHOBILI2ATION <br />------------------------------------------------------- <br />------------------------------------------------------ <br />Task 5... b Prep. by SSS Filename..M115-6 <br />Oate..... 03-Har-95 Permit 5 H-85-115 Mine......6reer Pit <br />Permit Action........ 110(2) bond recalculation <br />sheet 1 of 2 <br />Task Description..... Transport equipment to/from site <br />HOURLY EQUIPMENT COST <br />Mob/Demob Eqp. -Tractor <br />-Lt. Trailer <br />-Med. Trailer <br />-Hvy. Trailer <br />-Pilot Car <br />-Hyd. Crane <br />-Fuel Truck <br />-lobe Truck <br />-Flatbed Truck <br />Last Update: <br />HaY, 1941 <br />Cost Breakdown: <br />-------------------- <br />-------------------- <br />Uwnership CostJhr <br />Operating Cost/hr <br />Operator CostJhr <br />Helper Cost/hr <br />NOTE -This is a list to select from, not a list of mandatory items to include. <br />6z4, 75,D00 lb 6VW, 315 HP, diesel powered <br />25 ton folding gooseneck, drop deck <br />50 ton folding gooseneck, drop deck <br />120 Ton folding gooseneck, drop deck <br />On-highway light duty truck, 4z2, 130 hp, 1/2 ton rating, gasoline powered <br />Grove RT58D rough terrain hydraulic crane, 20 ton capacity, 125 hp, 60 ft. boom <br />bz4, 3,600 gallon capacity, 210 NP, diesel powered <br />6z4, 2,50D gallon capacity, 210 HP, diesel powered <br />20,OD0 lb 6VN, 175 HP, diesel powered <br />Lt. Rig Ned.Rig <br />(=25 T. 26-50 T. <br />------------------ <br />526.78 529.16 <br />523.23 ;24.76 <br />;20.54 520.54 <br />519.81 519.81 <br />------- ------- <br />Hvy .Rig Pilot Hydraulic Fuel Lube Flatbed <br />> 50 T. Car Crane Truck Truck Truck <br />---- <br />531 ----- <br />.74 ----------- <br />51.39 --------------- <br />519.89 --------------- <br />56.02 -------------- <br />510.66 ---------- <br />56,70 <br />529 .92 54.05 523.40 516.19 520,71 57.47 <br />520 .54 519.81 520.86 519.97 S19.97 514.97 <br />519. <br />---- 81 <br />--- S0.00 <br />------- SO.OD <br />------- 50.00 <br />------- 50.00 <br />------- 50.00 <br />------- <br />Total = 590.36 594.27 S10R.01 E25.25 Sh4.15 542.18 551.34 ;34.14 <br />NON-ROAOABLE EQUIPMENT: <br />""""""""""" Neight Ownership Haul Rig Fleet Site Haul Trip Return Trip DOT Permit <br />Machine Description (tons) Cost/hr CostJhr (no. hauled) CostJhr CostJhr Cost/ea <br />CAT D8N 34.60 Y40.11 E94.27 1 5134.38 594.27 <br />Subtotals 5134.38 E9d.27 50.00 <br />