My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV05544
DRMS
>
Back File Migration
>
Revision
>
REV05544
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:04:07 AM
Creation date
11/21/2007 9:26:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977020
IBM Index Class Name
Revision
Doc Date
7/21/1997
Doc Name
CONSTRUCTION MATERIALS PERMIT AMENDMENT DELTA SAND AND GRAVEL CO PIT 1 MLRB PN M-77-020 DELTA CNTY C
From
ENVIRONMENT INC
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Delta Sand and Grave. • <br />PIT #1 Amendment <br />M.L.R.B. # M-77-020 <br />July 13, 1997 <br />EXHIBIT D - Mining Plan <br />This amendment is to increase the acreage of the affected <br />lands from 19.76 acres ± to 45.19 acres ±, an increase of 25.43 <br />acres ±. We are adding two areas to the permit area as shown on <br />the AFFECTED LANDS Map on the Map Plat. The EAST PARCEL is the <br />largest of the two areas and covers approximately 19.92 acres. <br />This area was leased from Glen L. & Linda L. Black this spring. <br />The WEST PARCEL is the smaller of the two and covers 5.51 ac. ± <br />is owned by S&R Delta Partners L.L.L.P., who own the existing pit <br />area. The west area is currently used as part of an INDUSTRIAL <br />AREA that adjoins this pit on the south. <br />The method of mining will remain as approved in the original <br />application. The only variation being, that when the existing <br />parcel is mined out we will move into the EAST PARCEL shown on <br />the AFFECTED LANDS MAP. We will increase the mining line <br />setback, on this parcel only, from 25 feet to 50 feet from the <br />affected land line. This will give us room to build a sight berm <br />the owners want constructed along the south and west part of the <br />property, see Map Exhibit F. Mr. & Mrs. Black have asked us to <br />strip the entire mining area on the east parcel and build the <br />sight berm before mining begins. This will mean we will have a <br />larger than normal area stripped to accommodate their wishes. <br />Our bond estimate calculations for this amendment are shown on <br />page 12 of this text. The berm will be built with topsoil and <br />overburden stripped from the site prior to mining commencing. <br />Note that the berm extends off the affected lands on the east <br />side. This is required by our lease and should not be considered <br />part of the affected lands. This is because, only the berm will <br />be extended to the owners property line and no mining activities <br />will take place in the area east of the permit boundary. <br />On the WEST PARCEL and along the south side of the existing <br />mined area, where the site abuts the INDUSTRIAL AREA, we will <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.