Laserfiche WebLink
June 1995 Southfield Mine • TR-20 Responses (3) • 3 <br />3. The Division assumes that with the changes made on this table regarding the M-S Netolin <br />Creek topsoil, that EFCI will not construct M-Sat this time or add soil to M-1, and leave <br />the topsoil pile within the Newlin Creek permit area. Ijthis is correct, Map 14 should <br />be updated to delete M-S. <br />Response: Map 14 has been revised. <br />Page 2.05.4-13a <br />The Division will sill require a written agreement with the Corley Company or an <br />approved Succession of Operator (SOJ application before the Division approves the use <br />of the Newlin Creek topsoil plle for reclamation of the Southfield Mine. It is possible to <br />stipulate the agreement or approval of the SO to the approval of thrs TR. <br />Response: EFCI is in [he process of acquiring a le[ter from Dr Corley. A[ this poin[ EFCI <br />respectfully requests DMG [o stipulate this item. <br />Page 2.05.4-16 <br />It appears that a portion of the last sentence of the f rst paragraph was left out. Please <br />revise. <br />Response: Page 2.05.416 has been corrected. <br />G~19601TR~:ORS%JJ <br />06/OH/93 11:S1.m be <br />