Laserfiche WebLink
~~ ~I~'I~I~~II~~I~~ II~ <br />~ TWIN PINES INVESTMENT LIMITED PARTNERSHIP <br />FALCON ENERGY, INC. GENERAL PARTNER <br />TWIN PINES COAL MINE ft2 <br />(719) 784f369 <br />P. O. BOX 187 <br />1805 COUNTY ROAD M86 <br />ROCKVALE, COLORADO 81244 <br />February 23, 1993 <br /> <br />DEB 2 41993 <br />~~:.•; <br />Mrs, Catherine Begei M(:~'F'itiLS.;;aa~,,~~~i <br />Reclamation Specialist - <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Mid Term Review, Twin Pines No. 2 Mine; Permit No. C-83-058 <br />Dear Mrs. Beget: <br />Reference is made to your letter of January 13, 1993. The <br />following comments to your questions are set forth. Revisions to <br />the permit are being prepared and will be submitted in the near <br />future after consultation with the Division. <br />Legal, Financial, and Compliance Information -Rules 2.03 and <br />2.07,6(2) <br />1). - 4). The information requested is attached and is to be <br />inserted in the application; <br />Land Use - Rules 2.04.3, 2.05.5, and 4.16 <br />5). Post Mining Land Use of <br />Coal Sales is currently being <br />practical use of the sites. <br />developed with the lan <br />Commissioners, and Twin Pines <br />will effect final reclamation <br />Geology - Rules 2.04.5 and 2.04.6 <br />the Mine Site and Twin Pines <br />reviewed to determine the most <br />A plan is currently being <br />d owners, Fremont County <br />Investment. The proposed plan <br />of the sites. <br />6). From a review of Geologic Map of the Rockvale <br />Quadrangle, the Chandler Syncline generally plunges to the <br />South through Section 2. Included with the application is a <br />map of the Surface Geology and Top of the Brookside Coal <br />Seam which shows approximate contours of the seam and the <br />Chandler Syncline, which indicates a general dip to the <br />South. Orientation of the cross section shown on Figure <br />2.04.6-2, prepared by J. F. Sado & Associates, was not on <br />the axis of the syncline. <br />Water Rights and Replacement - Rules 2.04,7(3), 2.05.6(3)(ii), <br />2.07.6(2)(c), and 4.05.15 <br />1 <br />