Laserfiche WebLink
<br />s • <br />~~ <br />Mr. Gilbert F. Rindahl -2- October 2, 1981 <br />8. Will the haul road remain after mining is complete? <br />Exhibit F - Reclamation Plan Map <br />Z. The mining plan map and reclamation plan map do not correlate in the pond <br />area. If a 150 foot deep pond is formed, I assume that the area will be mined <br />and benched. The benches are not shown on either map. Please clarify this <br />matter. j2 <br />Exhibit G - Water Information <br />1. Please elaborate on the surface overflow drain channel which contains <br />Strain Gulch (p. G-11). Is this structure sho[/n on Exhibit C or Exhi hit F? <br />Exhibit H - Pildlife <br />1. Has the Division of Wildlife been contacted regarding this amendment? <br />Exhibit L - Reclamation Costs <br />1. The staff agrees that $29,389.50/acre is adequate for reclamation purposes. <br />2. Please submit a total bond proposal for this amendment, including a break- <br />down of major, moderate, and minor disturbance (acreage and cost/acre). <br />3. What distance is backfill material being transported? <br />4. Does the $400.00/acre to obtain and spread organic material include <br />transportation and purchase costs? <br />Please do not hesitate to contact me if you have any questions/comments. <br />Sincerely, <br />cam-/ ~~U r~~; ;~ <br />I <br />Jay Lucas <br />Reclamation Specialist <br />JL/mt <br />