Laserfiche WebLink
i~ <br /> <br /> 8 <br /> 1 l <br /> so <br />ong as the operator precedes with due diligent to protect the <br /> 2 property. <br /> 3 If the operator does not proceed with due diligent to <br />' 4 correct the problem, I think ell bets are off. Because of that, <br /> 5 I Pind that I feel, and I feel strongly in my mind, that despite <br />' 6 the fact th <br />t th <br />i <br />i <br />i <br />t <br />bl <br />l <br />t th <br /> a <br />ere <br />ous env <br />s a ser <br />ronmen <br />a <br />pro <br />em ou <br />ere, <br />' 7 I am not prepared to issue a notice of violation. <br /> 8 That is not to say that I don't think Castle Concrete <br />' 9 has any further obligation with regard to that. I think that <br /> 10 they have a very strong obligation to work expeditiously and in <br /> 11 good faith and <br />ut forth not just reasonable but their best <br /> p <br />' 12 effort and to come up with--not just to try to, but come up with <br /> 13 a corrective action and to proceed with the rendition of that <br /> 14 corrective action in an expeditious manner. <br /> 15 In failure to do so, I would be prepared in sometime in <br />' 16 the future to reinitiate this process, and I would assure every <br /> 17 one here in the event we do that--in the event that this Board or <br /> 18 this one member of this Board does not find or finds that the <br />' 19 Castle Concrete had not exercised its best effort to cone up with <br /> 20 a corrective plan and to which corrective plan met with the <br />' 21 satisfaction of this Division, and did not proceed with all <br /> 22 diligence to initiate and to proceed with all diligence to <br /> <br /> 23 complete that corrective plan, not only would I be willing to <br />' 24 reopen or to initiate or to see the initiation of a civil penalty <br /> 25 in notice of violation proceedings, but I can assure every one <br />J <br />J <br />