Laserfiche WebLink
26 <br />1 The operator has submitted some of that. But as we <br />2 have heard today from the geotechnical engineer, that they've <br />3 hired that this is still some stuff that needs to be done. <br />4 To continue for the corrective action to the slope <br />5 damage, it would also include stabilize the slides and reseed and <br />6 replace damaged trees by October 30. <br />7 MR. ENTZ: Mr. Chairman? <br />8 CHAIRMAN DANIELSON: Yes. <br />9 MR. ENTZ: I would move we do not issue a cease and <br />10 desist and as approve staff recommendations for corrective <br />11 action. <br />12 HS. KAEGER-ROVEY: Second. <br />13 CHAIRMAN DANIELSON: Is there--is discussion of this <br />14 motion--yeah, Fred, did you have-- <br />15 MR. BANTA: There was one condition that I recommended <br />16 and that is at area which Castle Concrete owned that the permit <br />17 be modified that clearly reflects that in the permit area and <br />18 that once we have reviewed this material then the appropriate <br />19 bond be submitted such that is in the event we have to do that. <br />20 We can done the reclamation. What that deans is that <br />21 we would have--that they would be under a permit of this Board <br />22 and would have to comply with all the terms and conditions of <br />23 that permit with respect to that area. <br />24 The reason I did not include the Cave of the Winds are <br />25 in my suggestion and also in the Cedar Heights area, is that it-- <br />