My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV05228
DRMS
>
Back File Migration
>
Revision
>
REV05228
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:03:40 AM
Creation date
11/21/2007 9:23:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977210
IBM Index Class Name
Revision
Doc Date
10/3/1994
Doc Name
RECLAMATION COST SUMMARY FORM
Type & Sequence
AM4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DOZER COST 6 PERFORMANCE DATA YDRKSHEET cont'd <br />Model: Cet D8N <br />ADJUSTED COST SUBTOTALS <br />sheet 2 of 2 sheet <br />I______________________________ Ownership Cos [s .___________I ___________________ Overhaul d Operating Costs __________________ <br />Dozer, RODS i Attachment p2: ~ Dozer 8 RODS: <br />Single shifts 525.98 511.52 f8.28 53.74 f9.17 54.15 f7.40 f11.92 f3.01 50.00 S1. <br />Double shifts f19.48 55.76 54.14 Attachment M2: <br />Triple shifts (17.33 f3.84 52.76 50.62 51.03 f1.14 f0.B8 f0.00 50.23 f0.00 f0. <br />HOURLY OPERATOR NAGES <br /> Base Fringe F.I .C.A UnmQl. Nk.COnp. Total ~ Shift <br />Labor Classification <br />_____________________________ Rate <br />_______________ Benefits <br />_____________ 7.70% <br />_____ 6.20X 12.SOX (5/h r)I Dif feren[i al <br /> <br />Dozer operator (< 70hp) <br />f13.60 <br />f3.50 _______ <br />51.05 ________ <br />50.84 ________ <br />51.70 _______I <br />520.69 ~ _______________I <br />Day f0.00 ~ 2 shift/day avg.: 50. <br />Dozer operator (>=70hp) f14.30 f3.50 f1.10 f0.89 51.79 f21.58 ~ Swing: f0.30 ~ 3 shift/day avg.: 50. <br />Mechanic 514.60 f3.50 f1.12 50.91 51.83 521.95 ~ Night: f0.45 <br />HOURLY EWIPMENT COST SUMMARY <br /> Ownership ~ Opereti n9 8 Overhaul Costs ~ Operator ~ Total <br /> Costs ~ Dozer Ripper ~ Costs ~ Cos[/NR (S) <br />_ <br />f irg le shifts ______________ <br />SG5.78 ________________________________ <br />540.63 f4.b3 ________________ <br />521.58 _______________ <br />5112.62 <br />Double shifts 529.38 540.63 f4.b3 521.73 f96.37 <br />Triple shifts 523.92 540.63 f4.b3 521.83 591.01 <br />EDUIPMENT PERFORMANCE DATA <br />- - - EOUI PNENT SPECIFICATIONS - - - <br /> Horsepower Trans. <br /> Descri pion <br />__________________ (FHP) <br />______________ Type <br />___________ <br />MACHINE MAKE 8 MCDEL: Cat DBN 285 Powershift <br />D02ER BLADE: Universal N/A N/A <br />ATTACHMENT ill: ROPS Cab N/A N/A <br />ATTACHMENT q2: 3-shank ripper N/A N/A <br />Neight Length Nidth Height Fuel Ripper <br />(tons) (ft.) (ft.) (ft.) Type Type <br />29.5 20.5 10.0 11.3 diesel N/A <br />5.7 x/A 14.0 5.6 N/A N/A <br />N/A N/A N/A N/A N/A N/A <br />4.9 4.8 8.1 2.6 N/A Adj. Parallelogram <br />Total N[.: 40.1 tons <br />
The URL can be used to link to this page
Your browser does not support the video tag.