Laserfiche WebLink
XOURLY PRODUCTION cont'd Sheet 2 of 2 <br />Loader Cycle Time cant'd <br />Rolling Resistance <br />Road~ay underfooting conditions: <br />Haul :Rutted dirt, little/ra maim., 1 -2" fire pen. <br />Return:RUtted dirt, little/no main[., 1 -2" fire pen. <br /> Grade RoLLing Total Travel <br /> Length Resist. Resist. Resist. Time <br />Haul 8 return Time: (ft) (X) (X) (X) (min.) <br />Naul Route: 700 73.00 5.00 18.00 7.705 (CHB »U/,) <br />Return Route: 700 -73.00 5.00 -8.00 0.650 (CN8 X'h~) <br /> Total travel time - 2.355 <br /> Total cycle time = 2.860 minutes <br />Loader Bucket Capacity <br />Rated Capacity= 4.50 LCY (heaped) <br />Bucket fill factor= 0.975 Loose mat.-moist mined aggregates(95 -700X) <br />Adjusted capacity= 4.39 LCY <br />Job Cordition Correction Factors <br />Site altitude = 7,150 ft. <br />Altitude correction factor = 7.00 (CHB DEO) <br />Job efficiency factor = 0.83 (1sh/day) <br />Ne[ Correction = 0.83 multiplier <br />Unedj usted Hourly Unit Production 92.05 LCY/Xr <br />Adjusted Xourly Unit Production 76.40 LCY/Hr <br />Adjusted Hourly Fleet Production 76.40 LCY/Hr <br />JOB COST <br />Flee[ size = 1 Loader(s) Total job time = 67.09 Hours <br />Unit cost = (0.994 /LCY Total job cost = 54,638.46 <br />