Laserfiche WebLink
Colorado Division of Minerals and Geology <br />ESTIMATING FORM - YHEEL LOADER IgRK <br />Task #: 13 Prep: by: RCO Tesk filename M210-13 <br />Date 09/30/94 Permit #:M-77-210 Mine: Snyder wuarry <br />------------ --------- ------------------- <br />Permitting action Reclamation of exi st irg Rorth Yell <br />Task description Dumping soil on benches <br />HOURLY EGUI PNENT LOST <br />Basic machine: CAT 966E <br />Attachment #1: ROPS Cab <br />Cost Breakdown - Ownership = 531.38 <br />------------ - Operating-Loader = 522.97 <br />- Operator = 521.58 <br />Sheet 1 of 2 <br />Horsepower = 216 <br />Shift basis: l/day <br />cool OSIi) <br />100 X utilization <br />- Total Lost/hr = 575.93 Total fleet cost/hr = 575.93 <br />MATERIAL OUANT (TIES <br />___________________ <br />___________________ <br />Initial SweLL Final <br />volume = 4,667.0 LCY factor = N/A volume = 4,667.0 LCY <br />----------- --------- ------------ <br />Quantity source/reference Amendment application <br />X Swell source/reference Program <br />HOURLY PRODUCTION <br />Loader Cycle Time <br />Unadjusted Basic Cycle Time (load, dump 8 maneuver) = 0.525 min. <br />(CHB USA) <br />Cycle Time Factors: Factor (min.) <br />Material- Mixed materiel 0.020 (CXB l6A) <br />Pile- Conveyor or dozer piled 10 ft. high 8 0.000 (CHB l6A) <br />Truck Ownership- No adjustment - factor rwt applicable 0.000 (CHB lEA) <br />Operation- Constant operation -0.040 (CHB l6A) <br />Target- Nominal target 0.000 (CHB l8A) <br /> Net Cycle Time Adj.= -0.020 min. <br /> Adj. Basic Cyc Le Time = 0.505 min. <br />