Laserfiche WebLink
Colorado Division of Minerals end Geology <br />ESTIMATING FORM - MOTOR GRADER YORK <br />Task #: 11B Prep. by: RCO Task File Name: M210-11B <br />Date: 09/30/94 Permit #:M-77-210 Mine: Snyder ouarry <br />Permit Action: Final reclamation - other areas <br />Task Description: Finish grade topsoil <br />HOURLY EDUIPMENT LOST <br />______________ _____ Basic Machine: CAT 130 SERIES G Horsepower: 135 <br /> Attachment #1: N/A ~^ ~ Shift Basis: 1/day <br /> Attachment #2: Multi-shank ripper --------- <br />Cost Breakdown: ----------- ------ <br />-------------- Utilization X (DOI OSIi) <br />Ownership cost/hr = f16.08 N/A <br />Operating 8 overhaul cost/hr -g reeler = f16.09 100 <br /> -ripper = f0.00 ~ 0 <br />Operator cost/hr = f21.76 N/A <br />Total egpt. unit cost/hr = 553.93 Total fleet cost/h r: 553.93 <br />MATERIAL QUANTITIES <br />Total area to be graded: 19.20 acres <br />Source of opmn[i ty take-off: Aneno)nent application <br />HOURLY PRODUCTION <br />_________________ <br />_________________ <br />Selected grading activity/work level: Nadium grading only <br />Unedj usted hourly wit production: 1.44 acres/hr (Cat Xandbook 6SA) <br />Job Condition Correction Factors: <br />Avg. site altitude 7150 ft. <br />Altitude adjustment: <br />Job efficiency.... <br />Net Job Correction: <br />1.00 (Cat Handbook 1bi) <br />0.83 (1sh/day YIiA) <br />0.83 <br />Adjusted hourly unit production: <br />Adjusted hourly fleet production: <br />JOB COST <br />Fleet size 1 Grader(s) <br />Unit Cost f45. 125 /acre <br />1.20 acres/hr <br />1.20 acres/hr <br />Total Job Time: 16.06 Hours <br />------------- <br />Total Job Cost: f866.41 <br />