Laserfiche WebLink
HOURLY PRODUCTION con['d <br />Loader Cycle Time cont'd <br />Sheet 2 of 2 <br />Rolling Resistance <br />Roadway underfootirg cordit ions: <br />Haul :Rutted dirt, little/no mein[., 1 -2" [ire pen. <br />Return:Rutted dirt, little/no mein[., 1 -2" Lire pen. <br /> Grade Rolling Total Travel <br /> Length Resist. Resist. Resist. Time <br />Haul 8 return Time: (f t) (X) (X) (X) (min.) <br />Haul Route: 500 5.00 5.00 10.00 0.709 (CHB »l)'A) <br />Return Route: 500 -5.00 5.00 0.00 0.347 (CHB '4K~) <br /> Total travel time = 1.057 <br /> Total cycle tine = 1.562 minutes <br />Loader Bucket Capacity <br />Rated Capacity= 4.50 LCY (heaped) <br />Bucket fill factor= 0.975 Loose mat.-moist mixed eggrega[es(95 -100X) <br />Adjusted capacity= 4.39 LCY <br />Job Condition Correction Factors <br />Site altitude = 7,150 ft. <br />Altitude correction factor = 1.00 (CHB D60) <br />Job efficiency factor = 0.83 (1sh/day) <br />Net Correction = 0.83 mil tiplier <br />Unadjusted Xourly Uni[ Production 168.58 LCY/Hr <br />Adjusted Hourly Unit Production 139.92 LCY/Nr <br />Adjusted Hourly Fleet Production 139.92 LCY/Hr <br />JOB COST <br />F Leet size = 1 Loader(s) Total job time = 110.69 Xours <br />Unit cost = 50.543 /LCY Total job cost = 58,405.07 <br />