Laserfiche WebLink
HOURLY PRODUCTION cont'd Sheet 2 of 2 <br />_________________ <br />_________________ <br />Loader Cycle Time cont'd <br />Rolling Resistance <br />Roadyey underfooting corxli Lions: <br />Xeul :Rutted dirt, little/no meint., 1-2'~ ti re pen. <br />Return:RuC[ed dirt, little/no mein[., 1-2" ti re pen. <br /> Grade Rolling Total Travel <br /> Length Resist . Resist. Resist. Time <br />Haul 8 return Time: (ft) (X) (X) (X) (min.) <br />Haul Route: 700 -6.00 5.00 -1.00 0.494 (CHB xlfh) <br />Return Route: 700 6.00 5.00 11.00 0.821 (CHB '4150 <br /> Total travel time = 1.315 <br /> Total cycle time = `1.820 minutes <br />Loader Bucket Capacity <br />NRated Capacity= 4.50 LCY (heaped) <br />Bucket fill factor= 0.975 Loose mat.-moist mixed eggregates(95 -100X) <br />Adjusted capacity= 4.39 LCY <br />Job Condition Correction Factors <br />Site altitude = 7,150 ft. <br />Altitude correction factor = 1.00 (CNB D60) <br />Job efficiency factor = 0.83 (1sh/day) <br />Net Correction = 0.83 mil tiplier <br />Unadjusted Xourly Unit Production 144.64 LCY/Nr <br />Adjusted Hourly Unit Production 120.05 LCY/Hr <br />Adjusted Hourly Fleet Production 120.05 LCY/Hr <br />JOB COST <br />Fleet size = 1 Loader(s) Total job time = 2922.68 Hours <br /> <br />Unit cost _______ <br />= f0.632 /LCY <br />Total ___________ <br />job cost = f221,938.53 <br />