Laserfiche WebLink
Colorado Division of Minerals and Geology <br />ESTIMATING FORM - YHEEL LOADER IARK <br />Task #: 5 Prep. by: RCO Task filename : M210-5 <br />Date 09/30/94 Permit #:N-77-210 Mine: Snyder guarry <br />Pe'mitting action Final reclamation - Area W <br />Task description : Beckfill limestone waste - existing pit <br />HOURLY EWIPMENT COST <br />Basic machine: CAT 966E <br />Attachment #1: ROPS Cab <br />Sheet 1 of 2 <br />Xorsepower = 216 <br />Shift bas is: l/day <br />cool biu> <br />Cost Breakdown - Ownership = 531,38 <br />------------- - Operating-loader = 522,97 100 X utilization <br />- Operator = f21,58 <br />- Total cost/hr = 575,93 Total fleet tost/hr = 575.93 <br />IUTERIAL OUANT IT IES <br />Initial Swell Final <br />volume = 350,900.0 LCY factor = N/A volume = 350,900.0 LCY <br />Duentity source/reference Amerdnen[ eppt icet ion <br />X Swell source/reference Program <br />HOURLY PRODUCTION <br />Loader Cycle Ting <br />Unadjusted Basic Cycle Time (load, dump 8 maneuver) = 0.525 min. <br /> (CXB USA)--- <br />Cycle Time Factors: Factor (min.) <br />Neteriel- Nixed material 0.020 (CNB 16>;) <br />Pile- Conveyor or dozer piled 10 ft. high 8 0.000 (CXB f6A) <br />Truck Ownership- No adjustment - factor not applicable 0.000 (CHB IBIS) <br />Operation- Constant operation -0.040 (CXB 18A) <br />Target- Nominal target 0.000 (CHB f6x) <br /> Net Cytle Time Adj.= -0.020 min. <br /> Adj. Basic Cycle Time = 0.505 min. <br />