Laserfiche WebLink
NQIRLY PRODUCTION cont'd Sheet 2 of 2 <br />_________________ <br />_________________ <br />Loader Cycle Time cont'd <br />Rolling Resistance <br />Roadyay underfooting corditions: <br />Haul :Rutted dirt, little/no meint., 1 -2" tiro pen. <br />Return:Rutted dirt, little/no meint., 1 -2" fire pen. <br /> Grade Rolling Total Travel <br /> Lergth Resist. Resist. Resist. Time <br />Haul 8 return Time: (f t) (X) (%) (%) (min.) <br />Naul Route: 700 10.00 5.00 75.00 7.451 (CHB .ifG) <br />Return Route: 700 -10.00 5.00 -5.00 0.529 (CHB 14'h~) <br /> Total travel time = 1.979 <br /> Total cycle time = + N 2.484 minutes <br />Loader Bucket Capacity <br />Rated Cepaci ty= 4.50 LCY (heaped) <br />Bucket fill factor= 0.975 Loose met.-moist mixed aggregates(95 -700X) <br />Adjusted capacity= 4.39 LCY <br />Job Conrli Lion Correction Factors <br />Site altitude = 7.150 ft. <br />Altitude correction factor = 1.00 (CHB Dbb) <br />Job efficiency factor = 0.83 (1sh/day) <br />Net Correction = 0.83 multiplier <br />Unedj usted Hourly Unit Production 705.96 LCY/Hr <br />Adjusted Nourly Unit Production 87.95 LCY/Hr <br />Adjusted Xourly Fleet Production 87.95 LCY/Hr <br />JOB LOST <br />Fleet size = 1 Loader(s) Total job time = 52.28 Xours <br />Unit cost (0.863 /LCY ToteL job cost = f3,969.84 <br />