My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV05228
DRMS
>
Back File Migration
>
Revision
>
REV05228
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:03:40 AM
Creation date
11/21/2007 9:23:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977210
IBM Index Class Name
Revision
Doc Date
10/3/1994
Doc Name
RECLAMATION COST SUMMARY FORM
Type & Sequence
AM4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NQIRLY PRODUCTION cont'd Sheet 2 of 2 <br />_________________ <br />_________________ <br />Loader Cycle Time cont'd <br />Rolling Resistance <br />Roadyay underfooting corditions: <br />Haul :Rutted dirt, little/no meint., 1 -2" tiro pen. <br />Return:Rutted dirt, little/no meint., 1 -2" fire pen. <br /> Grade Rolling Total Travel <br /> Lergth Resist. Resist. Resist. Time <br />Haul 8 return Time: (f t) (X) (%) (%) (min.) <br />Naul Route: 700 10.00 5.00 75.00 7.451 (CHB .ifG) <br />Return Route: 700 -10.00 5.00 -5.00 0.529 (CHB 14'h~) <br /> Total travel time = 1.979 <br /> Total cycle time = + N 2.484 minutes <br />Loader Bucket Capacity <br />Rated Cepaci ty= 4.50 LCY (heaped) <br />Bucket fill factor= 0.975 Loose met.-moist mixed aggregates(95 -700X) <br />Adjusted capacity= 4.39 LCY <br />Job Conrli Lion Correction Factors <br />Site altitude = 7.150 ft. <br />Altitude correction factor = 1.00 (CHB Dbb) <br />Job efficiency factor = 0.83 (1sh/day) <br />Net Correction = 0.83 multiplier <br />Unedj usted Hourly Unit Production 705.96 LCY/Hr <br />Adjusted Nourly Unit Production 87.95 LCY/Hr <br />Adjusted Xourly Fleet Production 87.95 LCY/Hr <br />JOB LOST <br />Fleet size = 1 Loader(s) Total job time = 52.28 Xours <br />Unit cost (0.863 /LCY ToteL job cost = f3,969.84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.