Laserfiche WebLink
Colorado Division of Miners Ls and Geology <br />ESTIMATING FORM - WXEEL LOADER WORK <br />Task #: 2 Prep. by: RCO Tesk filename M210-2 <br />Date 09/30/94 Permit #:M-77-210 Mine: Snyder Quarry <br />Permitting action Final reclamation - West Ridge <br />Task destri ption Spreed topsoil - 5.7 acres <br />HOURLY EQUIPMENT LOST <br />Basic machine: CAT 966E <br />Attachment #1: BOPS Ceb <br />Sheet 1 of 2 <br />Horsepower = 216 <br />Shift basi s: l/day <br />(oat OSIi> <br />Cost Breakdown - Ownership = (31.38 <br />------------- - Operating-loader = f22.97 100 X utilization <br />- Operator = f21.58 <br />- iotaL cost/hr = 575.93 Total fleet cost/hr = f75.93 <br />MATERIAL QUANTITIES <br />___________________ <br />___________________ <br />Initial Swell Final <br />volume = 4,598.0 LCY factor = N/A volume = 4,598.0 LCY <br />Quantity source/reference Amendment application <br />X Swell source/reference Program <br />HOURLY PRODUCTION <br />Loader Cyc Le Time <br />_________________ <br />Unadjusted Basic Cycle Time (load, duip 8 maneuver) = 0.525 min. <br />(cxB OSA>--- <br />Cycle Time Factors: Factor (min.) <br />Materiel- Mixed material 0.020 (CHB lnA) <br />Pile- Conveyor or dozer piled 10 ft. high 8 0.000 (CHB l8A) <br />Truck Ownership- No adjustment - factor not applicable 0.000 (CHB (bpi) <br />Operation- Constant operation -0.040 (CXB fE]f) <br />Target- Nominal target 0.000 (CHB Ib~i) <br /> Net Cycle Tine Adj.= -0.020 min. <br /> Adj. Basic Cycle Time = 0.505 min. <br />