Laserfiche WebLink
XOURLY PRODUCTION cont'd <br />_________________ <br />_________________ <br />Loader Cycle Time cont'd <br />Sheet 2 of 2 <br />RoLLing Resistance <br />Roadway underfooting Conditions: <br />Xeul :Rutted dirt, little/no meint., 1 -2" ti re pen. <br />Return:Rutted dirt, tittle/no meint., 1 -2" ti re pen. <br /> Grade Rolling Total Travel <br /> Length Resist. Resist. Resist. Time <br />Haul 8 return Time: (ft) (X) (X) (X) (min.) <br />Haul Route: 700 10.00 5.00 15.00 1.451 (CHB >wPh) <br />Return Route: 700 -10.00 5.00 -5.00 0.529 (CHB %Y,') <br /> Total travel time = 1.979 <br /> Total cycle time = 2.484 minutes <br />Loader Bucket Capacity <br />Rated Capacity= 4.50 LCY (heaped) <br />Bucket fill factor= 0.975 Loose nat.-moist mixed agg regates(95 -100X) <br />Adjusted capacity= 4.39 LCY <br />Job Condition Correction Factors <br />Site altitude = 7,150 ft. <br />Altitude correction factor = 1.00 (CHB D60) <br />Job efficiency factor = 0.83 (1sh/day) <br />Net Correction = 0.83 multiplier <br />Unadjusted Hourly Unit Production 705.96 LCY/Hr <br />Adjusted Hourly Unit Production 87.95 LCY/Hr <br />Adjusted Hourly Fleet Production 87.95 LCY/Hr <br />JOB COST <br />Fleet size = 1 Loader(s) Total job time = 170.56 Hours <br />Unit Lost = 50.863 /LCY Total job cost = 512,950.75 <br />